Business

Stakeholder Completes Phase I Exploration on Ballarat Project, Yukon

TORONTO, ON / ACCESSWIRE / July 6, 2016 / Stakeholder Gold Corp. (TSXV: SRC) ("Stakeholder...

articleStakeholder Gold Corp.July 6, 20165/company/stakeholder-gold-corp/news/stakeholder-completes-phase-i-exploration-on-ballarat-project-yukon
Stakeholder Completes Phase I Exploration on Ballarat Project, Yukon

About this update from Stakeholder Gold Corp.

[{"type":"text","content":"Stakeholder Completes Phase I Exploration on Ballarat Project, YukonTORONTO, ON / ACCESSWIRE / July 6, 2016 / Stakeholder Gold Corp. (TSXV: SRC) (\"Stakeholder\" or the \"Company\") is pleased to announce that the Phase I exploration program on the Company's Ballarat property, located in the Dawson Range, Yukon, has been completed. The Program was planned, executed and managed by GroundTruth Exploration Inc.\nInduced polarization/resistivity and GT probe surveys were conducted on the Northwest Zone over a strike length of 1,800 metres. In-fill soil samples were collected where the terrain was not accessible with the GT probe.\nThe Eastern Zone, located about 7 km from the Northwest Zone, has been gridded and soil sampled; approximately 500 samples have been collected from that location. A follow-up program of geophysics and GT probe testing is planned once the results of the soil sampling have been received and reviewed, likely to be sometime after mid-July.\nThe Ballarat Project was recently visited by Company management. It has been determined that the previous drilling (5 holes) did not adequately test the Northwest Zone. Evidence from the trenches (2010) and the preliminary geophysical survey and GT probe analyses (XRF) indicate that the target zone(s) lie north and northwest of the holes drilled in 2012.\nWhen results from the Phase I program have been compiled and reviewed, a rotary air blast (RAB) drilling program is planned to commence in early August.\nThe target at Ballarat, like many of the gold deposits in the Yukon Range, is a structurally-controlled (orogenic) type, hosted by moderate to high grade metamorphic rocks that have undergone subsequent large scale faulting and localized intrusion with accompanying hydrothermal alteration and mineralization.\nOn May 12, 2016, Kaminak Gold Corporation announced that Goldcorp Inc. had agreed to acquire the Coffee Gold Project by purchasing all of the outstanding Kaminak shares, a transaction value of CDN $520 million (Kaminak press release, May 12, 2016.)\nThe Coffee Deposit is located about 17 km southwest of the Northwest Zone on Ballarat.\nJohn Nebocat, P.Eng is a Qualified Person under NI 43-101, and has reviewed and approved the technical portions of this news release. \nAbout Stakeholder Gold Corporation\nStakeholder Gold Corp. is a Canadian mineral exploration compan...

More updates from Stakeholder Gold Corp.