Business
St. James Gold Corp’s Operator Secures Drill Contractor for up to 13,000 Metres of Drilling at the Florin Gold Project in the Yukon Territory, Canada
VANCOUVER, BC, July 12, 2021 (GLOBE NEWSWIRE) -- St. James Gold Corp. (TSXV: LORD) (OTCQB: LRDJF) (FSE: BVU3), the “Company” or “St. James Gold” is pleased to a

About this update from St. James Gold Corp
[{"type":"text","content":" VANCOUVER, BC, July 12, 2021 (GLOBE NEWSWIRE) -- St. James Gold Corp. (TSXV: LORD) (OTCQB: LRDJF) (FSE: BVU3), the “Company” or “St. James Gold” is pleased to announce that on July 7, 2021 it’s Operator has secured Superior Diamond Drilling Inc., an established drill contractor based in Mayo, Yukon, to complete up to 13,000 metres of diamond drilling at its district-scale, 89 square-kilometre Florin Gold Project located in the prolific Tombstone gold belt of the Yukon Territory ,Canada. The majority of drilling at the Florin Gold Project this season will be focused on expansion drilling adjacent to the existing resource which currently contains an inferred mineral resource of 2.47 million oz gold in 170,993,000 tonnes grading .45 g/t gold, with a cut-off grade of .3 g/t gold (Simpson, 2021). Prior drill programs have encountered gold mineralization from surface to depth with intercepts and grades comparable to similar intrusion-related gold deposits in the region, including Victoria Gold's Eagle and Olive gold deposits*. The current resource area spans approximately 900 metres on strike along the NW fault which through multiple exploration programs has now been traced to in excess of 5 kilometres. In addition to expansion drilling to test for potential mineralization adjacent to the existing Resource Area the company intends to test other encouraging Geochem targets. In particular the company intends to drill test significant Geochem targets including greater than 500 ppb gold-in-soil anomalies that are approximately one km West of the existing Resource Area and generally overlying a target area covering 1 km x 1 km. Oversight of the Project is being provided by a 6-member Technical Committee which has currently identified a total of 6 high priority targets and 30+ drill holes at an estimated 300+- metres each. The company anticipates commencement of the mobilization and construction of a 28-person camp for the 2021 exploration drill program shortly and the Company will provide further updates regarding the same in the coming weeks. Highlights from the Florin Gold project: Hole Number From (meters) To (meters) Interval (meters) Au gm/t DD03-12 4.71 162.15 157.44 0.75 DD04-14 3...