Business
SPC Nickel Intersects 2.48% Nickel and 0.64% Copper over 7.8 metres at the West Graham Project, Sudbury, Ontario
SPC Nickel Intersects 2.48% Nickel and 0.64% Copper over 7.8 metres at the West Graham Project, S...

About this update from Spc Nickel Corp.
[{"type":"text","content":"\n \n \n \n SPC Nickel Intersects 2.48% Nickel and 0.64% Copper over 7.8 metres at the West Graham Project, Sudbury, Ontario\n \n \n /* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prngen2{\nPADDING-RIGHT:0.17em; PADDING-LEFT:0.17em; FONT-SIZE: 8PT; FONT-FAMILY: ARIAL; COLOR: BLACK; MARGIN:0em; BORDER-TOP:black 0pt; BORDER-RIGHT:black 0pt; BORDER-BOTTOM:black 0pt; BORDER-LEFT:black 0pt\n}\n.prnml4{\nMARGIN-TOP:0em; MARGIN-RIGHT:0em; MARGIN-BOTTOM:0em; MARGIN-LEFT:0.33em !IMPORTANT\n}\n.prnbcc{\nBORDER-COLLAPSE: COLLAPSE\n}\n \n \n \n \n \n \n Canada NewsWire\n \n \n \n \n \n \n SUDBURY, ON\n \n \n ,\n \n \n April 11, 2023\n \n \n /CNW/ -\n \n SPC Nickel Corp.\n \n (TSX-V: SPC) (\n \n \"SPC Nickel\"\n \n or the\n \n \"Company\"\n \n ), is pleased to announce initial assay results from its Phase 1 drilling campaign at the recently consolidated West Graham and Crean Hill 3 properties (collectively, the \"West Graham Project\"), including results of the massive sulphides reported in hole WG-23-026 (see news release dated\n \n March 27, 2023\n \n ).\n \n \n \n Highlights\n \n \n \n \n Hole WG-23-026, intersected\n \n 2.48% Ni, 0.64% Cu over 7.8 metres\n \n within a larger 143.0 metre wide zone (see Table 1) of 'West Graham-style' mineralization consisting of 5 to 20% disseminated to blebby sulphides.\n \n \n Individual massive sulphide samples returned values as high as\n \n 5.88% Ni\n \n over 0.57 metres (see Table 2).\n \n \n Hole WG-23-020, intersected\n \n 0.53% Ni, 0.27% Cu (0.63% NiEq) over 44.0 metres\n \n (see Table 1).\n \n \n To date, fourteen holes for 2,097 metres have been completed (See Figure 1). Assays from all holes not listed in Table 1 are pending.\n \n \n \n \n Grant Mourre\n \n , CEO and President of SPC Nickel commented, \"We are excited to announce the first assay results from our current drilling on the Crean Hill 3 side of the West Graham Project. These results demonstrate two important facts: first, the massive sulphide intersected in hole WG-23-026 confirms that the property has the potential to host high-grade, high-tenor nickel-copper massive sulphides bet...