Business

Southern Silver Intersects 15.3 metres Averaging 581g/t AgEq at Cerro Las Minitas Project in Durango, México

Vancouver, British Columbia--(Newsfile Corp. - January 27, 2026) - Southern Silver Exploration C...

articleSouthern Silver Exploration Corp.January 27, 20265/company/southern-silver-exploration-corp/news/southern-silver-intersects-153-metres-averaging-581gt-ageq-at-cerro-las-minitas-project-in-durango-mandxe9xico
Southern Silver Intersects 15.3 metres Averaging 581g/t AgEq at Cerro Las Minitas Project in Durango, México

About this update from Southern Silver Exploration Corp.

[{"type":"text","content":"Southern Silver Intersects 15.3 metres Averaging 581g/t AgEq at Cerro Las Minitas Project in Durango, MéxicoVancouver, British Columbia--(Newsfile Corp. - January 27, 2026) - Southern Silver Exploration Corp. (TSXV: SSV) (the \"Company\" or \"Southern Silver\") reports assays from an additional four holes which tested the recently acquired Puro Corazon claim and returned thick intervals of high-grade and strongly silver-enriched polymetallic mineralization.Highlight assays include:a 15.3 metre interval averaging 195g/t Ag, 0.3% Cu, 6.6% Pb and 9.0% Zn (581g/t AgEq), including a 3.1 metre interval averaging 267g/t Ag, 0.3% Cu, 7.8% Pb and 14.8% Zn (837g/t AgEq)(1) from drillhole 25CLM-206a 22.0 metre interval averaging 103g/t Ag, 0.5% Cu, 5.0% Pb and 7.2% Zn (426g/t AgEq), including a 3.0 metre interval averaging 208g/t Ag,1.2% Cu, 10.8% Pb and 15.8% Zn (929g/t AgEq)(1) from drillhole 25CLM-206; anda 11.1 metre interval averaging 54g/t Ag, 0.3% Cu, 1.2% Pb and 2.3% Zn (157g/t AgEq), including a 0.4 metre interval averaging 761g/t Ag, 2.6% Cu, 25.0% Pb and 21.2% Zn (1994g/t AgEq)(1) from drillhole 25CLM-207(1) see AgEq calculation criteria in notes to Table 1. Intervals are reported as estimated true thickness unless otherwise indicatedDrilling tested down dip and to the south of earlier reported drill holes 25CLM-202, -203, -204 and -205 which returned several high-grade intercepts within a hanging wall replacement zone of mineralization that include 10.5 metres averaging 1,115g/t AgEq (see News Release dated December 1, 2025) from 25CLM-203 and 10.4 metres averaging 743g/t AgEq (see News Release dated January 6, 2026) from 25CLM-205 as well as other mineralized intercepts. The new intercepts, particularly from drill hole 25CLM-206, continue to demonstrate continuity of the replacement lens and helps establish a potential plunge direction for the high-grade extensions of mineralization which has now been tested to a depth of 235 metres below surface. Vice President of Exploration, Rob Macdonald stated \"These latest drill results continue to demonstrate the lateral and down-dip extensions of mineralization below and along strike of the existing Puro Corazon workings. The drill program continues to test the projections of this mineralization with the goal of establishing continuity with the previously defined Skarn Front and ...

More updates from Southern Silver Exploration Corp.