Business

Southern Silver Intersects 10.4 metres Averaging 743g/t AgEq at Cerro Las Minitas Project in Durango, México

Vancouver, British Columbia--(Newsfile Corp. - January 6, 2026) - Southern Silver Exploration Co...

articleSouthern Silver Exploration Corp.January 6, 20263/company/southern-silver-exploration-corp/news/southern-silver-intersects-104-metres-averaging-743gt-ageq-at-cerro-las-minitas-project-in-durango-mandxe9xico
Southern Silver Intersects 10.4 metres Averaging 743g/t AgEq at Cerro Las Minitas Project in Durango, México

About this update from Southern Silver Exploration Corp.

[{"type":"text","content":"Southern Silver Intersects 10.4 metres Averaging 743g/t AgEq at Cerro Las Minitas Project in Durango, MéxicoVancouver, British Columbia--(Newsfile Corp. - January 6, 2026) - Southern Silver Exploration Corp. (TSXV: SSV) (the \"Company\" or \"Southern Silver\") reports assays from four holes which test the recently acquired Puro Corazon claim including further near-surface high-grade silver mineralization in a replacement zone sitting outside the main Skarn zone and the historic Puro Corazon workings.Highlight assays include:a 10.4 metre interval averaging 365g/t Ag, 0.1g/t Au, 0.1% Cu, 7.8% Pb and 8.2% Zn (743g/t AgEq), including a 3.9 metre interval averaging 688g/t Ag, 0.2g/t Au, 0.1% Cu, 17.1% Pb and 17.1% Zn (1,490g/t AgEq)(1) from drillhole 25CLM-205(1) see AgEq calculation criteria in notes to Table 1. Intervals are reported as estimated true thickness unless otherwise indicatedThe highlight interval is a 65 metre step-out from previously reported Bonanza-silver mineralization in drill hole 25CLM-203 which returned 10.5 metres averaging 1,115g/t AgEq (see NR-16-26; Dec. 1, 2025). Both mineralized intervals exhibit a similar replacement-style of mineralization, are located on the outer edge of the main skarn zone and may form part of a high-grade hanging wall Carbonate-Replacement (CRD) zone outboard of the historic Puro Corazon workings. Drilling also intersected multiple additional mineralized zones including further shallow mineralization in drill holes 25CLM-202 and 25CLM-204 which correlate to the previously modelled and structurally controlled mineralization in the El Sol deposit and deeper intercepts correlating to the main Skarn Front deposit.Other highlight assays from the first four drill holes identified shallow mineralization (within 100 metres of surface) attributed to the El Sol veins including:a 5.3 metre interval averaging 73g/t Ag, 2.8% Pb and 3.4% Zn (221g/t AgEq), including a 1.2 metre interval averaging 170g/t Ag, 0.1% Cu, 8.9% Pb and 3.7% Zn (449g/t AgEq)(1) from drill hole 25CLM-202; anda 7.3 metre interval averaging 102g/t Ag, 0.5% Cu, 3.6% Pb and 3.7% Zn (305g/t AgEq), including a 4.0 metre interval averaging 131g/t Ag, 0.1g/t Au, 6.4% Pb and 5.4% Zn (456g/t AgEq)(1) from drill hole 25CLM-204. (1) see AgEq calculation criteria in notes to Table 1. Intervals are reported as estimated true thickne...

More updates from Southern Silver Exploration Corp.