Business
Sonoro Energy Ltd. Provides Drilling Update with Completion of Four Multi-Lateral Horizontal Legs with Approximately 1,600 Meters of Horizontal Section
(TheNewswire) Calgary, Alberta – TheNewswire - December 21, 2023 - S...

About this update from Sonoro Energy Ltd.
[{"type":"text","content":"Sonoro Energy Ltd. Provides Drilling Update with Completion of Four Multi-Lateral Horizontal Legs with Approximately 1,600 Meters of Horizontal Section \n \n \n (TheNewswire)\n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n Calgary, Alberta\n \n \n –\n \n \n TheNewswire -\n \n \n December 21, 2023 -\n \n \n Sonoro Energy Ltd.\n(\"Sonoro\" or the \"Company\") (TSXV:SNV)  is\npleased to provide an update for the drilling of 14-29-32-23 W3 well\nin Saskatchewan, whereby it has finished the drilling portion of its\nfirst Waseca multi-lateral horizontal well with 4 horizontal legs for\na total lateral length of approximately 1,600 meters. The Waseca\nformation was encountered structurally as expected and during the\ndrilling of the four lateral sections, each lateral encountered clean\nsands with strong oil shows at surface and in abundance on the chip\nsamples recovered.\n \n \n \n \n The first of two slotted liners has been successfully\nset. A second liner is expected to be run in the next 24 hours\ndemonstrating a new technology to place multiple slotted liners into\ntwo separate legs of a multilateral horizontal well. The ability to\nhang slotted liners into multiple horizontal legs within one well can\nprovide the ability to achieve step rate increases in production rate\nand recoverable reserves.\n \n \n \n \n Sonoro anticipates the rig release of this horizontal\nwell on December 22, 2023 and has initiated the planning for\ncompleting, procuring, and equipping this horizontal well.   It is\nanticipated that with the holidays and lead time for equipment and a\ncompletion rig, the well will be brought on production in the second\nhalf of January with oil sales to occur shortly thereafter.\n \n \n \n \n Sonoro is simultaneously in the process of planning to\ndrill it’s next multilateral horizontal well with the inclusion of\nmultiple lined horizontal and lined sections into its design\nplan.\n \n \n \n \n Sonoro’s CEO Richard Wadsworth comments, “We are\nvery pleased with the results of Sonoro’s first multi-lateral\nhorizontal well and our ability to achieve this milestone along with\nthe strong oil shows seen in each lateral. We are enthusiastic to have\nthis well placed on production to see an expected higher well\nproductivity resulting from this reservoir, multilateral well strat...