Business
Solaris Resources Reports 600m of 1.0% CuEq and 462m of 1.0% CuEq From Surface, Continued Expansion of Warintza Central
VANCOUVER, BC, Feb. 22, 2021 /CNW/ - Solaris Resources Inc. (TSX: SLS); (OTCQB: SLSSF) ("Solaris" or the "Company") is pleased to report assay results from a se

About this update from Solaris Resources Inc
[{"type":"text","content":"VANCOUVER, BC, Feb. 22, 2021 /CNW/ - Solaris Resources Inc. (TSX: SLS); (OTCQB: SLSSF) (\"Solaris\" or the \"Company\") is pleased to report assay results from a series of additional holes from the ongoing diamond drilling program at its Warintza Project (\"Warintza\" or \"the Project\") in south-eastern Ecuador. Highlights from recent drilling are listed below and results are summarized in Tables 1 and 2. An updated 3D model will be posted on the Company's website when available. Highlights Four additional holes, as detailed below, have returned long intervals of high-grade mineralization starting from surface, extending the limits of mineralization to the west and northwest SLS-10 was an extensional hole collared at the western limit of drilling and drilled to the west, returning 600m of 1.00% CuEq¹ (0.83% Cu, 0.02% Mo, and 0.12 g/t Au), including 546m of 1.06% CuEq¹ (0.88% Cu, 0.03% Mo, and 0.12 g/t Au) from surface, significantly extending mineralization in this direction The high-grade interval of 600m of 1.00% CuEq¹ reported in SLS-10 corresponds to a high conductivity anomaly reflecting sulphide stockwork mineralization that continues to the west for a further 1.5km at or near surface and is being targeted in follow-up extensional drilling that is now underway SLS-11 was an extensional hole collared in the southeastern portion of the current Warintza Central drill pattern and drilled to the northwest into an open area, returning 688m of 0.57% CuEq¹ (0.39% Cu, 0.04% Mo, and 0.05 g/t Au) from surface SLS-12 returned 736m of 0.74% CuEq¹ (0.59% Cu, 0.03% Mo, and 0.07 g/t Au) from near surface, extending mineralization into an undrilled, open area between the eastern and western drilling at Warintza Central SLS-13 stepped out approximately 100m beyond the western limit of Warintza Central drilling and was drilled north into an open area, returning 462m of 1.00% CuEq¹ (0.80% Cu, 0.04% Mo, and 0.09 g/t Au) from surface, with the hole ending prematurely in strong mineralization To date, 17,400 metres have been drilled at Warintza Central in 21 holes of which results have been reported for 13; drilling is ongoing with six rigs currently operating and six more being added by mid-year, which will lead to a commensurate increase in the pace of results being reported Mr. Jorge Fierro, Vice President, Exploration, commented: \"Our...