Business

Solaris Resources Reports 186m of 0.64% CuEq From Near Surface, Continues to Expand ‘Indicative Starter Pit’ at Warintza Central

VANCOUVER, British Columbia, March 13, 2023 (GLOBE NEWSWIRE) -- Solaris Resources Inc. (TSX: SLS; OTCQB: SLSSF) (“Solaris” or “the Company”) is pleased to repor

articleSolaris Resources IncMarch 13, 20235/company/solaris-resources-inc/news/solaris-resources-reports-186m-of-064percent-cueq-from-near-surface-continues-to-expand-indicative-starter-pit-at-warintza-central
Solaris Resources Reports 186m of 0.64% CuEq From Near Surface, Continues to Expand ‘Indicative Starter Pit’ at Warintza Central

About this update from Solaris Resources Inc

[{"type":"text","content":" VANCOUVER, British Columbia, March 13, 2023 (GLOBE NEWSWIRE) -- Solaris Resources Inc. (TSX: SLS; OTCQB: SLSSF) (“Solaris” or “the Company”) is pleased to report assay results from a series of holes aimed at growing the Northeast Extension of the ‘Indicative Starter Pit’ at its Warintza Project (“Warintza” or “the Project”) in southeastern Ecuador. Highlights are listed below, with a corresponding image in Figure 1 and detailed results in Tables 1-2. Highlights Resource expansion drilling continues to grow the Northeast Extension of the ‘Indicative Starter Pit’, an area of near surface, high-grade mineralization estimated at 180 Mt at 0.82% CuEq¹ (Indicated) and 107 Mt at 0.73% CuEq¹ (Inferred) within the Warintza Mineral Resource Estimate² (“MRE”) based on drilling to the end of 2021. Assays are pending from follow-up step-out drilling, with additional platforms planned for construction. SLS-70 was collared at the northeastern limit of Warintza Central and drilled northeast into an open volume, returning 186m of 0.64% CuEq¹ from near surface within a broader interval of 264m of 0.55% CuEq¹, expanding the zone to the north where it remains open This hole follows from SLS-65, drilled approximately 90 degrees to the northwest from the same platform, which returned 286m of 0.55% CuEq¹ from near surface (refer to press release dated December 5, 2022) SLS-69, collared from the same platform and drilled the opposite direction to the southwest, returned 156m of 0.60% CuEq¹ from 52m depth within a broader interval of 846m of 0.30% CuEq¹, connecting the Northeast Extension to Warintza Central Prior hole SLS-66, drilled west-southwest, returned 124m of 0.82% CuEq¹ from near surface within a broader interval of 622m of 0.42% CuEq¹ (refer to press release dated September 7, 2022) from a platform to the south where a follow-up southwest-oriented hole is planned to better connect the Northeast Extension to Warintza Central Assays are pending from two newly constructed 250m step-out platforms testing the zone further to the northeast, with additional platforms planned for construction as the weather improves Mr. Jorge Fierro, Vice President, Exploration, commented: “The Northeast Extension represents a significant area of focus for growing the ‘Indicative Starter Pit’, one of the two key goals for the follow-on drilling pr...

More updates from Solaris Resources Inc