Business

Solaris Resources Reports 1,184m of 0.68% CuEq From Surface in Expansion of Warintza Central; Maiden Drilling Commences at El Trinche

VANCOUVER, BC, Sept. 7, 2021 /CNW/ - Solaris Resources Inc. (TSX: SLS) (OTCQB: SLSSF) ("Solaris" or the "Company") is pleased to report the latest assay results

articleSolaris Resources IncSeptember 7, 20213/company/solaris-resources-inc/news/solaris-resources-reports-1184m-of-068percent-cueq-from-surface-in-expansion-of-warintza-central-maiden-drilling-commences-at-el-trinche
Solaris Resources Reports 1,184m of 0.68% CuEq From Surface in Expansion of Warintza Central; Maiden Drilling Commences at El Trinche

About this update from Solaris Resources Inc

[{"type":"text","content":" VANCOUVER, BC, Sept. 7, 2021 /CNW/ - Solaris Resources Inc. (TSX: SLS) (OTCQB: SLSSF) (\"Solaris\" or the \"Company\") is pleased to report the latest assay results from ongoing resource expansion drilling at its Warintza Project (\"Warintza\" or \"the Project\") in southeastern Ecuador.  Highlights are listed below, with corresponding images in Figures 1-2 and detailed results in Tables 1-2. A dynamic 3D model is available on the Company's website and will be updated to incorporate the most recent results. Highlights Three additional holes at Warintza Central have infilled gaps within the drilling pattern and extended the envelope of high-grade mineralization to the east, with high-grade mineralization encountered in all holes starting at or near surface SLS-27 was collared in the southwestern part of Warintza Central and drilled into a partially-open volume to the northeast, returning 462m of 0.91% CuEq¹ from near surface, including 372m of 1.02% CuEq¹ from 36m depth, infilling and extending mineralization in this area SLS-28 was collared in the middle of Warintza Central and drilled into a partially-open volume to the northeast, returning 632m of 0.68% CuEq¹ from surface, including 316m of 1.00% CuEq¹ from 42m depth, infilling and extending mineralization in this area SLS-29 was collared at the southeastern limit of the Warintza Central grid and drilled into an open volume to the east, returning 1,184m of 0.68% CuEq¹ from surface, including 480m of 0.80% CuEq¹ from 48m depth, extending mineralization to the east in this area Maiden drilling has begun at El Trinche, a potential southern extension of Warintza Central, with the first hole collared approximately 500m beyond the southern limit of drilling in an area of rock sampling with values ranging from 0.3-1.1% copper at surface To date, 40 holes have been completed at Warintza Central with assays reported for 29 of these. The assay backlog has grown due to downtime at the Project's principal lab in Lima to install additional equipment and increase capacity, with operations having now resumed Increased news flow is expected from September through year-end, including remaining assays from SLSE-01, which marked a new discovery at Warintza East (see press release dated July 20, 2021), with the Company adding a second rig to accelerate this important drilling Mr. Jorge...

More updates from Solaris Resources Inc