Business
Skyharbour’s Partner Company Basin Uranium Corp. Continues to Intersect Anomalous Uranium Mineralization at Mann Lake
Vancouver, BC, March 07, 2023 (GLOBE NEWSWIRE) -- Skyharbour Resources Ltd.’s (TSX-V: SYH) (OTCQX: SYHBF) (Frankfurt: SC1P) (the “Company”) partner company, Bas

About this update from Skyharbour Resources Ltd.
[{"type":"text","content":" Vancouver, BC, March 07, 2023 (GLOBE NEWSWIRE) -- Skyharbour Resources Ltd.’s (TSX-V: SYH) (OTCQX: SYHBF) (Frankfurt: SC1P) (the “Company”) partner company, Basin Uranium Corp. (“Basin Uranium”) is pleased to announce the intersection of significant mineralization from the three-hole Phase 2 drill program at its Mann Lake project located 25 km southwest of the McArthur River Mine and 15 km to the northeast along strike of Cameco’s Millennium uranium deposit. A total of 6,279 metres of diamond drilling was completed on the Mann Lake property during the 2022 season. Mann Lake Uranium Project: Highlights: Drilling continued to intersect notable pathfinder elements (B, Co, Cu, Ni, and Pb) which provides for vectoring towards uranium mineralization as it is typically associated with Athabasca Basin unconformity-style mineralization. Hole MN22-0007 intersected the unconformity at 671.8 metres and returned anomalous boron (dravite) and uranium mineralization at and above the unconformity. Dravite is a boron rich clay mineral, often found in association with uranium mineralization and is considered an important pathfinder in uranium exploration. Notable intercepts include 1,060 ppm B from 669.3 – 669.8 metres (0.5 metres), 931 ppm B from 668.8 – 669.3 metres (0.5 metres), and 614 ppm boron (B) from 668.8 – 671.8 metres (2.5 metres) in conjunction with 41 ppm U3O8 from 671.8 – 672.3 metres (0.5 metres). Significant polymetallic mineralization was intersected below the unconformity of hole MN22-007 including 884 ppm Cu from 679.2 – 679.7 metres (0.5 metres) and 158 ppm Zn from 676.0 – 683.75 metres (17.75 metres). Significant boron mineralization was also encountered in hole MN22-008 which intersected the unconformity at 649.02 metres and returned 386 ppm B from 646.02 – 648.52 metres (2.5 metres). Mann Lake Dill Plan 2022: Phase Two Drill Program Summary: The Phase 2 program was comprised of 2,776 metres of diamond drilling over four holes. The first hole MN22-006 was wedged and re-started at 572 metres (MN22-006A), serving as a follow up hole to MN22-002 which was drilled during Phase 1 and hosted prospective uranium mineralization. The following two holes MN22-007 and MN22-008, targeted the southeastern portion of the tenure which had previously been untested. This southeastern zone was drilled to test a strong interpreted b...