Business
Layne de Mexico Commences Phase 1 Drilling at Silver Spruce El Mezquite Au-Ag Project, Sonora, Mexico
BEDFORD, NS / ACCESSWIRE / June 3, 2021 / Silver Spruce Resources Inc. ("Silver Spruce" or t...

About this update from Silver Spruce Resources Inc.
[{"type":"text","content":"Layne de Mexico Commences Phase 1 Drilling at Silver Spruce El Mezquite Au-Ag Project, Sonora, MexicoBEDFORD, NS / ACCESSWIRE / June 3, 2021 / Silver Spruce Resources Inc. (\"Silver Spruce\" or the \"Company\") (TSXV:SSE) (FRA:S6Q1) is very pleased to announce the commencement of Phase 1 exploration drilling by Layne de Mexico at the El Mezquite Au-Ag property (\"El Mezquite\" or the \"Property\").The first-ever drilling program at El Mezquite should be completed by July with samples submitted to ALS Global in Hermosillo on a weekly basis. Laboratory assay results are anticipated from two to six weeks after submittal and will guide Phase 2 drilling after the summer rainy season. New targets also are developing from our ongoing geological, hyperspectral and LiDAR compilation.\"Drill pad construction will be completed on June 3rd and the drill also will be turning today. With new land access agreements in place and our LiDAR digital topographic base received from Eagle Mapping, we look forward to a successful maiden drilling campaign for El Mezquite,\" stated Greg Davison, Silver Spruce Vice-President Exploration and Director. \"The Phase 1 2,000 metre RC program will utilize eight drill pad locations focused around a 400m x 600m area with elevated precious metal values to 3.41 g/t Au and 387 g/t Ag. Collars were defined by several northeast-trending veins, structural lineaments and oxide/sulphide transitions interpreted from geological mapping, precious metal assays, multi-element geochemistry, epithermal alteration assemblages and coincident 3D IP chargeability anomalies.\"Figure 1. Looking south across El Mezquite - TRAX D7 CAT preparing to clear northern drill pad B2 for south and southeasterly directed RC holes targeting northeast-trending gold-bearing structures. Large gossan area, in background, with additional, recently identified, anomalous gold in rock samples.The geological and construction teams arrived on site May 20th to May 23rd and returned to the Property on June 2nd to carry out the remainder of the pad preparation accompanied by a D7 Caterpillar dozer (see Figure 1) contracted from Constructora Trax, S.A. de C.V. (\"TRAX\"), a Hermosillo-based construction firm. Layne de Mexico also mobilized the reverse circulation (\"RC\") rig to the Property on June 2nd.El Mezquite, a drill-ready precious metal project locate...