Commodities
Silver One Resources Announces Upgrade of Leach Pad Resources to Measured & Indicated at Candelaria
Vancouver, British Columbia--(Newsfile Corp. - August 27, 2026) - Silver One Resources Inc. (TSXV: SVE) (OTCQX: SLVRF) (FSE: BRK1) is pleased to report the completion of its Leach Pad resource update at the Candelaria Project in Nevada, resulting in an upgrade of previously Indicated resources on LP1 to the Measured and Indicated ("M&I"), and Inferred to Indicated on LP2. The effective date of the upgraded resource estimate is July 29, 2026. A copy of the National Instrument 43-101 ("NI...

About this update from Silver One Resources Inc.
Vancouver, British Columbia--(Newsfile Corp. - August 27, 2026) - Silver One Resources Inc. (TSXV: SVE) (OTCQX: SLVRF) (FSE: BRK1) is pleased to report the completion of its Leach Pad resource update at the Candelaria Project in Nevada, resulting in an upgrade of previously Indicated resources on LP1 to the Measured and Indicated ("M&I"), and Inferred to Indicated on LP2. The effective date of the upgraded resource estimate is July 29, 2026. A copy of the National Instrument 43-101 ("NI 43-101") technical report (the "Report") on the Project will be filed on the SEDAR+ shortly after issuance of this news release. The Technical Report is titled "Technical Report: Updated Mineral Resource Estimate Heap Leach Pads on the Candelaria Property, Mineral and Esmeralda Counties, Nevada, USA" was prepared by James A. McCrea, P.Geo., who is a qualified person within the meaning of NI 43-101, is independent of the Company and has reviewed and approved the disclosure regarding the updated resource estimate included herein. Resource Upgrade Highlights: Candelaria's project resources (from open-pit, underground, stockpiles and heap-leach pads) now total 126.6 million ounces of silver equivalent (120,709,000 ounces Ag, and 242,000 ounces Au) in the Measured and Indicated categories, and 13.4 million ounces of silver equivalent (12,597,000 ounces Ag and 33,800 ounces Au) in the Inferred category (see Table 1 and Table 2 below). Gregory Crowe, President and CEO, commented: "Upgrading the Leach Pad resource to entirely Measured and Indicated categories marks a major step forward for Silver One. This strengthened resource will feed directly into our Pre-Feasibility Study, which remains on track for completion before year-end. The improved confidence in tonnage and grade, combined with the metallurgical data we are generating, positions Candelaria for meaningful advancement as we continue to unlock value for our shareholders." The resource upgrade incorporates the results of 36 sonic drill holes drilled at LP1 in 1992, 45 sonic drill holes drilled in 2017 and 56 Hollow Stem Auger ("HSA") holes drilled in 2026, completed across the LP1 and LP2 leach pads. Table 1. Candelaria Leach Pad Mineral Resources. Effective Date July 29, 2026. To view an enhanced version of this graphic, please visit: https://images.newsfilecorp.com/files/4730/311738_sve-table1.jpg *- Contained Metal based on fire assay grades ˧ - AgEq(T) formula = Ag (T) + (Au * recovery * 67.73/0.8841) Ag, Au recoveries used in the calculation. Prices for calculating silver equivalents are US$27.5 oz Ag and US$2106 oz Au. LP1 cyanide leach estimated field silver and gold recoveries are 25% and 20% respectively. KCA lab column leach tests Ag and Au recoveries are 29% and 21% respectively. LP2 cyanide leach estimated field silver and gold recoveries are 35% and 25% respectively. KCA lab column leach tests Ag and Au recoveries are 40% and 27% respectively. Metal prices used for this resource estimate were US$2106/oz Au, US$27.50 oz Ag. Same prices were used for the processing scenarios related to reasonable prospects for eventual economic extraction. ZTEM Airborne Electromagnetic Survey Processing and interpretation of the ZTEM data has been completed at Candelaria and a number of anomalies were identified. Surface reconnaissance of the anomalous areas has also been completed; assays of samples collected have been received and are currently being processed. These results will be integrated with previous airborne magnetics, ground IP, and previous rock geochemical data to refine and prioritize future drill targets. Final interpretations and assays are expected to be reported within the next few weeks. Exploration Drilling Drilling has been temporarily paused following an incident that rendered the rig inoperative. Drilling operations are expected to resume during the second week of September. To date, four drill holes have been completed for a total of 1,884 meters. Samples are currently being prepared for shipment to the laboratory for assay. Any drilling delays at Candelaria will not affect the Company's timeline for a Pre-Feasibility Study ("PFS") at Candelaria. Next Steps As the upgraded resource is solely measured and indicated resources, the entire updated resource from the leach pads will be incorporated into the ongoing PFS, which will integrate: The Company expects to deliver the PFS before the end of 2026. Table 2. Candelaria in-ground, underground, and stockpiles mineral resource estimates (effective April 30, 2025) To view an enhanced version of this graphic, please visit: https://images.newsfilecorp.com/files/4730/311738_2238808504fc392a_002full.jpg Additional details of the above resource estimate are set forth in the Company's news release dated May 6, 2025. Qualified Person The technical content of this news release has been reviewed and approved by Robert M. Cann, P. Geo, a Qualified Person as defined by National Instrument 43-101 and an independent consultant to the Company. About Silver One Silver One is focused on the exploration and development of quality silver projects. The Company holds a 100% interest in its flagship project, the past-producing Candelaria Mine located in Nevada. Potential reprocessing of silver from the historic leach pads at Candelaria provides an opportunity for possible near-term production. Additional opportunities lie in previously identified high-grade silver intercepts down-dip and potentially increasing the substantive silver mineralization along-strike from the two past-producing open pits. The Company owns 636 lode claims and five patented claims on its Cherokee project located in Lincoln County, Nevada, host to multiple silver-copper-gold vein systems, traced to date for over 11 km along-strike. Silver One also owns a 100% interest in the Silver Phoenix Project. The Silver Phoenix Project is a very high-grade native silver prospect that lies within the "Arizona Silver Belt," immediately adjacent to the prolific copper producing area of Globe, Arizona. For more information, please contact: Silver One Resources Inc. Gary Lindsey - VP, Investor Relations Phone: 604-974‐5274 Mobile : (720) 273-6224 Email : [email protected] Forward-Looking Statements Information set forth in this news release contains forward-looking statements that are based on assumptions as of the date of this news release. These statements reflect management's current estimates, beliefs, intentions and expectations. They are not guarantees of future performance. Silver One cautions that all forward-looking statements are inherently uncertain, and that actual performance may be affected by a number of material factors, many of which are beyond Silver One's control. Such factors include, among other things: risks and uncertainties relating to Silver One's limited operating history, ability to obtain sufficient financing to carry out its exploration and development objectives on the Candelaria Project, obtaining the necessary permits to carry out its activities and the need to comply with environmental and governmental regulations. Accordingly, actual and future events, conditions and results may differ materially from the estimates, beliefs, intentions and expectations expressed or implied in the forward-looking information. Except as required under applicable securities legislation, Silver One undertakes no obligation to publicly update or revise forward-looking information. NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE. To view the source version of this press release, please visit https://www.newsfilecorp.com/release/311738
View stock analysis, news, and events for Silver One Resources Inc.