Business
Silver North Extends Main Fault Silver Mineralization an Additional 50 metres Along Strike at the Haldane Silver Property, Keno District, Yukon
(TheNewswire) • Intersects 231 g/t silver, 0.24 g/t gold, 0.54% lead and 0.39 % zinc...

About this update from Silver North Resources Ltd.
[{"type":"text","content":"Silver North Extends Main Fault Silver Mineralization an Additional 50 metres Along Strike at the Haldane Silver Property, Keno District, Yukon\n\n\n (TheNewswire)\n \n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n • Intersects 231 g/t\nsilver, 0.24 g/t gold, 0.54% lead and 0.39 % zinc over 14.40 m from\n170.60 m to 185.00 m in HLD25-35 including 1.25 m averaging 1,261 g/t\nsilver, 0.74 g/t gold, 0.35% lead and 0.41% zinc.\n \n\n\n • Results received from two of four remaining holes at the\nMain Fault target.\n \n\n • With five holes reported, Main Fault extended to a total of\n100 metres on strike and 150 m downdip in drilling and 300 m downdip\nfrom surface.\n \n\n\n Vancouver, BC, December 10, 2025\n \n\n –\n \n\n TheNewswire –\n \n\n Silver North Resources Ltd. (TSX-V: SNAG,\nOTCQB: TARSF)\n \n\n “\n \n\n Silver North\n \n\n ” or\nthe “\n \n\n Company\n \n\n ”) announces that the Company has received results from an\nadditional two holes completed during the 2025 exploration program at\nits flagship Haldane Silver Property in the historic Keno Hill Silver\nDistrict, Yukon. Holes HLD25-34 and 35 were drilled to intersect Main\nFault mineralization approximately 50 m to the southwest of the\ndiscovery section (HLD24-29 and -30, HLD 25- 31 – see news release\ndated November 17, 2025), successfully extending the Main Fault in\nthis direction. The Main Fault has been intersected in drilling over\n100 metres in strike dimension and approximately 150 metres downdip\n(over 300 metres downdip from surface mineralization.\n \n\n Results include 1.25 metres averaging 1,261\ng/t silver, 0.74 g/t gold, 0.35% lead and 0.41% zinc starting at 179.5\nm,\n \n\n within a larger 14.4 metre intersection of\n231 g/t silver, 0.24 g/t gold, 0.54% lead and 0.39% zinc\n \n\n starting at 170.6 m in HLD25-35\n \n\n .\n \n\n To date, five of\neight holes (totaling 1,759.5 metres) completed in the 2025 program\nhave now been reported. The road-accessible 8,579 hectare Haldane\nProperty is located 25 km west of Keno City, YT, adjacent to Hecla\nMining’s producing Keno Hill Silver Mine property, and hosts\nnumerous occurrences of silver-lead-zinc-bearing quartz siderite veins\nas seen elsewhere in the district.\n \n\n\n\n “The Main Fault continues to...