Business
Prophecy Drills 89 Meters Grading 279 g/t Ag, 1.28% Zn and 1.17% Pb, Including 12 Meters Grading 1,085 g/t Ag Starting 16 Meters Downhole at Its Paca Silver Project in Bolivia
VANCOUVER, BC / ACCESSWIRE / October 28, 2019 / Prophecy Development Corp. (" Prophecy " o...

About this update from Silver Elephant Mining Corp
[{"type":"text","content":"Prophecy Drills 89 Meters Grading 279 g/t Ag, 1.28% Zn and 1.17% Pb, Including 12 Meters Grading 1,085 g/t Ag Starting 16 Meters Downhole at Its Paca Silver Project in BoliviaVANCOUVER, BC / ACCESSWIRE / October 28, 2019 / Prophecy Development Corp. (\"Prophecy\" or the \"Company\") (TSX:PCY, OTCQX:PRPCF, Frankfurt:1P2N) is pleased to announce the diamond drilling results from Prophecy's 100% controlled Paca silver project in the Potosi department of Bolivia. Borehole PND 110 intersected 89 meters grading 378 g/t Ag-Equivalent (\"AgEq;\" 279 g/t Ag, 1.28% Zn, 1.17% Pb) starting from 9 meters downhole, including 12 meters grading 1,085 g/t Ag starting at just 16 meters downhole.Phase 1 Drill highlights include:PND107: 54.0 meters of 238 g/t AgEq (151 g/t Ag, 1.01% Zn, 1.17% Pb) from 55.0 to 109.0 meters;PND108: 24.0 meters of 307 g/t AgEq (200 g/t Ag, 0.60% Zn, 2.12% Pb) from 33.0 to 57.0 meters;PND109: 28.0 meters of 281 g/t AgEq (242 g/t Ag, 0.27% Zn, 0.69% Pb) from 15.0 to 43.0 meters;PND110: 89.0 meters of 378 g/t AgEq (279 g/t Ag, 1.28% Zn, 1.17% Pb) from 9.0 to 98.0 meters;PND112: 1.0 meters of 904 g/t AgEq (890 g/t Ag, 0.05% Zn, 0.31% Pb) from 21.0 to 22.0 meters;PND 113: 25.0 meters of 209 g/t AgEq (196 g/t Ag, 0.04% Zn, 0.29% Pb) from 3.0 to 28.0 meters.Reported widths are intercepted core lengths and not true widths, as relationships with intercepted structures and contacts vary. Based on core-angle measurements, true widths are estimated at approximately 77% of reported core lengths.Silver equivalent (\"AgEq\") calculation is based on NI43-101 compliant 2017 resource report completed for the Paca deposit by Mercator Geological Services (see Company's press release dated November 22nd, 2017). Silver equivalent is calculated as follows: Ag Eq. (g/t) = Ag (g/t) + (Pb% *(US$0.94/ lb. Pb /14.583 Troy oz./lb./US$16.50 per Troy oz. Ag)*10,000) + (Zn% *(US$1.00/lb. Zn/14.583 Troy oz./lb./US$16.50 per Troy oz. Ag)*10,000). 100 % metal recoveries are assumed based on lack of comprehensive metallurgical resultsPUD110 reported the highest silver width-grade intercept at the Paca project to date, which now has over 19,000 drill meters completed between Prophecy and the previous operator since 2002.These Phase 1 drill results are anticipated to increase the overall tonnage and upgrade the confidence level of the current NI43-101 com...