Business
Silver Bull Resources Drills 16 Meters of 396 g/t Silver and 1.61% Copper at Sierra Mojada Project
VANCOUVER, British Columbia, Nov. 15, 2017 (GLOBE NEWSWIRE) -- Silver Bull Resources, Inc. (TSX:SVB) (OTCQB:SVBL) (“Silver Bull”) is pleased to provide results

About this update from Silver Bull Resources, Inc.
[{"type":"text","content":"VANCOUVER, British Columbia, Nov. 15, 2017 (GLOBE NEWSWIRE) -- Silver Bull Resources, Inc. (TSX:SVB) (OTCQB:SVBL) (“Silver Bull”) is pleased to provide results from its continued underground drill program targeting the newly discovered Sulphide Zone, which sits under the previously defined oxide zone on the Sierra Mojada Project in Coahuila, Northern Mexico. Highlights from the four holes announced in this news release include: Hole T17003 – 16 meters @ 396g/t silver and 1.61% copper including 5 meters @ 379g/t silver and 3.25% copper from 0 meters to 5 meters, and 6 meters @ 610g/t silver and 1.12% copper from 10 meters to 16 meters. Hole T17004 – 7 meters @ 370g/t silver and 0.85% copper. Hole hit historical workings and was terminated Hole T17006 – 4.8 meters @ 352g/t silver and 0.58% copper. Hole hit historical workings and was terminated The Sulphide Zone: A continuous underground channel sampling program conducted by Silver Bull during the month of August 2017 identified a series of east-west trending high angle structure hosting sulphide mineralization (announced in a news release on 11 September 2017). Results from the continuous channel sampling program yielded 31.5 meters grading at 22.36% zinc, 134.5g/t silver, 2.05% lead, 0.21% copper and 10.5 meters @ 432g/t silver, 1.15% zinc, 0.05% lead, 1.22% copper and is the target of the current drill program The Drill Program: For the drill program Silver Bull is utilizing a company owned Termite drill rig which aims to test the grade, thickness, and continuity of the sulphide mineralization identified by the channel sampling program. The Termite is capable of drilling up to 100 meters of NQ diamond core and five drill stations are presently planned with more expected to be added as the drill program progresses. Assays for the holes are as follows: Hole_ID Hole Length (m) From (m) To (m) Interval (m) Ag (G/T) Cu (%) T17003 60.65 0 16 16 396 1.61 including 0 5 5 379 3.25 and 10 16 6 610 1.12 T17004 10 0 7 7 370 0.85 T17005 31 No significant results T17006 7.5 0 4.8 4.8 352 0.58 Tim Barry, President, CEO and director of Silver Bull states, “The results from this batch of drilling in the sulphide zone are exceptional. The consistent high grade silver-copper mineralization we see in this particular area is hosted along a steeply dipping fault and remai...