Business

Silver Bull Intersects 17 Meters of Sulphide Mineralization Grading 301g/t Silver & 1.75% Copper, Including 4 Meters at 502g/t Silver and 2.14% Copper, on the Sierra Mojada Project, Coahuila, Mexico

VANCOUVER, British Columbia, Jan. 31, 2018 (GLOBE NEWSWIRE) -- Silver Bull Resources, Inc. (TSX:SVB) (OTCQB:SVBL) (“Silver Bull”) is pleased to provide results

articleSilver Bull Resources, Inc.January 31, 20183/company/silver-bull-resources-inc/news/silver-bull-intersects-17-meters-of-sulphide-mineralization-grading-301gt-silver-and-175percent-copper-including-4-meters-at-502gt-silver-and-214percent-copper-on-the-sierra-mojada-project-coahuila-mexico
Silver Bull Intersects 17 Meters of Sulphide Mineralization Grading 301g/t Silver & 1.75% Copper, Including 4 Meters at 502g/t Silver and 2.14% Copper, on the Sierra Mojada Project, Coahuila, Mexico

About this update from Silver Bull Resources, Inc.

[{"type":"text","content":"VANCOUVER, British Columbia, Jan. 31, 2018 (GLOBE NEWSWIRE) -- Silver Bull Resources, Inc. (TSX:SVB) (OTCQB:SVBL) (“Silver Bull”) is pleased to provide results of 5 drill holes from its continued underground drill program targeting the newly discovered Sulphide Zone, which sits under the previously defined oxide zone on the Sierra Mojada Project in Coahuila, Northern Mexico. Highlights from the five holes announced in this news release include: Hole T17013 – 17 meters @ 301g/t silver and 1.75% copper including 4 meters @ 502g/t silver and 2.14% copper. Hole T17014 – 7.1 meters @ 163g/t silver and 0.57% copper & 1.7 meters @ 197g/t silver and 1.27% copper. Hole hit historical workings and was terminated Hole T17015 – 1 meter @ 312g/t silver and 1.83% copper at 67 meters at the end of the hole. The hole hit historical workings and was terminated The Sulphide Zone: A continuous underground channel sampling program conducted by Silver Bull during the month of August 2017 identified a series of east-west trending high angle structure hosting sulphide mineralization (announced in a news release on 11 September 2017). Results from the continuous channel sampling program yielded 31.5 meters grading at 22.36% zinc, 134.5g/t silver, 2.05% lead, 0.21% copper and 10.5 meters @ 432g/t silver, 1.15% zinc, 0.05% lead, 1.22% and is the target of the current drill program. The Drill Program: Silver Bull is utilizing a company owned Termite drill rig which aims to test the grade, thickness, and continuity of the sulphide mineralization identified by the channel sampling program. The Termite is capable of drilling up to 100 meters of NQ diamond core and five drill stations are presently planned with more expected to be added as the drill program progresses. Assays for the holes reported are as follows: Hole ID Hole Length (m) From To Interval Ag (G/T) Cu (%) Comments T17011 39.65 No significant results   T17012 43.75 No significant results   T17013 40.5 0 17 17 301 1.75 Includes 4 meters @ 502g/t Silver and 2.14% copper T17014 31.7 0 7.1 7.1 163 0.57   30 31.7 1.7 197 1.27 Hole hit old workings – ended in mineralization T17015 70.25 66 67 1 312 1.83 Hole hit old workings – ended in mineralization Tim Barry, President, CEO and director of Silver Bull states, “We are very pleased with the continued excellent results from our under...

More updates from Silver Bull Resources, Inc.