Business

Wash Plant Secured

Wash Plant Secured.

articleShuka Minerals PlcFebruary 23, 20174/company/shuka-minerals-plc/news/wash-plant-secured
Wash Plant Secured

About this update from Shuka Minerals Plc

[{"type":"text","content":"\n \nRNS Number : 6032X Edenville Energy PLC 23 February 2017  \n\n23 February 2017\n \n \n \nEDENVILLE ENERGY PLC\n(\"Edenville\" or the \"Company\")\n \n \nWash Plant Secured\n \nEdenville Energy plc (AIM: EDL) is pleased to announce it has secured a coal washing plant and crusher in the anticipation of starting coal production at its Rukwa Coal Project in western Tanzania.  \n \nKey Points\n \n\n\n\n\n·     \n\n\nCoal washing plant secured; \n \n\n\n\n\n·     \n\n\nCrusher secured; and\n \n\n\n\n\n·     \n\n\nWash plant engineer appointed.  \n \n\n\n\n\n \nThe wash plant is based on a dense medium separation system, a well known and trusted method to wash and beneficiate coal.  This will enable several different product specifications to be produced to allow the maximum flexibility in providing a suitable product for customers.\n \nThe wash plant has been inspected and reviewed by an independent process engineering consultant and was selected after extensive evaluation of alternative options.  It is modular in structure and can be transported to site in containerised form and will be assembled at a suitable location close to the Rukwa coal deposit. \n \nAssuming the resolutions are passed at the Company's forthcoming General Meeting on 17 March 2017, we expect to complete the purchase of the wash plant as soon as possible thereafter, at which point the shipping and assembly processes can start. \n \nIn addition to the wash plant, the Company has secured a suitable coal crusher plant to prepare and size the Run of Mine coal.  It is planned that this crusher will be shipped to site at the same time as the wash plant.  \n \nThe Company recognises it needs expert professional input into the construction and operation of the wash plant and has therefore appointed a qualified engineer with significant experience of both construction and operation of these types of plants. The engineer has already begun work on the necessary requirements for shipment and construction.\n \nRufus Short CEO of Edenville Energy commented:  \"We are very pleased to announce this next phase in the development of the mining operations.  The wash plant is an integral par...

More updates from Shuka Minerals Plc