Business

Scottie Resources Intercepts 7.43 g/t Gold over 18.75 M and 37 g/t Gold over 2.85 M at Blueberry Contact Zone at Scottie Gold Mine Project, BC

Vancouver, British Columbia--(Newsfile Corp. - September 25, 2025) - Scottie Resources Corp.&#xA0...

articleScottie Resources Corp.September 25, 20254/company/scottie-resources-corp/news/scottie-resources-intercepts-743-gt-gold-over-1875-m-and-37-gt-gold-over-285-m-at-blueberry-contact-zone-at-scottie-gold-mine-project-bc
Scottie Resources Intercepts 7.43 g/t Gold over 18.75 M and 37 g/t Gold over 2.85 M at Blueberry Contact Zone at Scottie Gold Mine Project, BC

About this update from Scottie Resources Corp.

[{"type":"text","content":"Scottie Resources Intercepts 7.43 g/t Gold over 18.75 M and 37 g/t Gold over 2.85 M at Blueberry Contact Zone at Scottie Gold Mine Project, BCVancouver, British Columbia--(Newsfile Corp. - September 25, 2025) - Scottie Resources Corp. (TSXV: SCOT) (OTCQB: SCTSF) (FSE: SR80) (\"Scottie\" or the \"Company\") is pleased to report new assays from its 2025 drilling of the Blueberry Contact Zone within the Scottie Gold Mine Project. The road-accessible Scottie Gold Mine Project, which includes the 100%-owned past-producing Scottie Gold Mine and the adjacent Blueberry Contact Zone, is located 35 kilometres north of Stewart, BC. Drilling in 2025 continues to deliver strong results, including intercepts of 7.43 g/t gold over 18.75 metres and 37 g/t gold over 2.85 metres at the Blueberry Contact Zone. The fully funded 25,000-metre drill program is ongoing, with less than 15% of assays reported to date and additional results expected through the remainder of the year. In parallel, bulk sample activities are advancing on schedule, with mucking from the final blast completed, waste backfilling underway, and mineralized material being crushed for transport. Processing of the bulk sample at a third-party facility is planned for mid-October. Highlights:Blueberry Contact drillhole SR25-370 intersected 7.43 grams per tonne (g/t) gold over 18.75 metres (m), including 30.0 g/t gold over 3.3 m at the Lemoffe vein zone (Table 1, Figures 1,2,4).Blueberry Contact drillhole SR25-369 intersected 37.0 g/t gold over 2.85 m at the Blueberry vein zone (Table 1, Figures 1,2,3).Blueberry Contact drillhole SR25-365 intersected 9.99 g/t gold over 4.00 m at the Fifi vein zone (Table 1, Figures 1,2).Blueberry Contact drillhole SR25-367 intersected 61.9 g/t gold over 1.00 m at the Fifi vein zone (Table 1, Figures 1,2).Bulk sample progressing on schedule. Mucking has been completed and crushing and transport down the Granduc road has commenced.\"Drilling at the Blueberry Contact Zone continues to deliver strong results,\" commented Dr. Thomas Mumford, President of the Company. \"These intercepts further support our understanding of the system and provide confidence in the continuity of mineralization. In parallel, bulk sample activities are advancing as planned and the sample remains on track for third-party processing in October. Together the drilling and...

More updates from Scottie Resources Corp.