Business

EMC Commences Environmental Work at Nyngan Scandium Project in NSW, Australia

Apr. 11, 2011 (Canada NewsWire Group) -- TSX: EMC www.emcmetals.com VANCOUVER, April 11...

articleScandium International Mining Corp.April 11, 20113/company/scandium-international-mining-corp/news/emc-commences-environmental-work-at-nyngan-scandium-project-in-nsw-australia
EMC Commences Environmental Work at Nyngan Scandium Project in NSW, Australia

About this update from Scandium International Mining Corp.

[{"type":"text","content":"\n\n\n Apr. 11, 2011 (Canada NewsWire Group) -- \n\n#ReleaseContent TABLE\n{\n BORDER-COLLAPSE: collapse\n}\nTR.cnwUnderlinedCell TD\n{\n BORDER-BOTTOM: #000000 1px solid\n}\nTR.cnwDoubleUnderlinedCell TD\n{\n BORDER-BOTTOM: #000000 3px double\n}\nTR.cnwBoldUnderlinedCell TD\n{\n BORDER-BOTTOM: #000000 3px solid\n}\nTD.cnwUnderlinedCell\n{\n BORDER-BOTTOM: #000000 1px solid\n}\nTD.cnwDoubleUnderlinedCell\n{\n BORDER-BOTTOM: #000000 3px double\n}\nTD.cnwBoldUnderlinedCell\n{\n BORDER-BOTTOM: #000000 3px solid\n}\n#ReleaseContent TABLE.cnwBorderedTable TD\n{\n BORDER-RIGHT: black 1px solid;\n PADDING-RIGHT: 2px;\n BORDER-TOP: black 1px solid;\n PADDING-LEFT: 2px;\n PADDING-BOTTOM: 2px;\n BORDER-LEFT: black 1px solid;\n PADDING-TOP: 2px;\n BORDER-BOTTOM: black 1px solid;\n BORDER-COLLAPSE: collapse\n}\n#ReleaseContent TABLE TD\n{\n PADDING-RIGHT: 2px;\n PADDING-LEFT: 2px;\n PADDING-BOTTOM: 2px;\n PADDING-TOP: 2px\n}\n\nTSX: EMC\nwww.emcmetals.com\n\nVANCOUVER, April 11 /CNW/ - EMC Metals Corp. (the "Company" or "EMC") (TSX: EMC) advises that environmental site work is being initiated on the Nyngan Scandium Project in NSW, Australia, in support of a feasibility study planned for the project later this year. Following the appointment of John Thompson to the position of VP Project Development last month, certain elements of the Environmental Impact Study have begun, under direction from R. W. Corkery & Co., (Orange, NSW, Australia).\nSpecific work steps have been or will shortly be initiated, including:\n\n\n >\n\n\nThe ground water assessment work will commence in April, with a program to install 8 ground water bores to test and evaluate the presence, salinity, and volumes of natural ground water, both in the proposed open pit area as well as anticipated facilities locations. Permanent water monitoring equipment will be installed in the bores to collect ongoing seasonal data on well water levels and conditions. A surface water study will follow the ground water study. Aerial mapping and the subsequent ground survey will also be commissioned in early May so as to provide accurate topographical survey information for design and operational purposes in the project area.\nDiscussions with property neighbors, the local community, and with regulatory authorities will be ongoing during this work, and will continue with t...

More updates from Scandium International Mining Corp.