Business
San Lorenzo Commences Expanded IP Geophysical Program At Salvadora Gold-Copper Property, Chile
(TheNewswire) CALGARY / April 23, 2025 – TheNewswire - San Lorenzo Gol...

About this update from San Lorenzo Gold Corp
[{"type":"text","content":"San Lorenzo Commences Expanded IP Geophysical Program At Salvadora Gold-Copper Property, Chile\n\n\n (TheNewswire)\n \n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n CALGARY / April 23, 2025 –\n \n\n TheNewswire -\n \n San\nLorenzo Gold Corp. (\"\n \n San\nLorenzo\n \n \" or the \"\n \n Company\n \n \") (TSXV: SLG) is pleased to announce that a\ngeophysical crew has been mobilized to the Company’s flagship\nSalvadora gold-copper property in Chile to commence a detailed and\nexpanded geophysical survey of induced polarization (“\n \n IP\n \n ”).\n \n\n\n Induced Polarity Geophysical\nProgram\n \n\n\n The IP program will consist of approximately 32 line-kilometers of\nexpanded and infill coverage over two key priority target areas\nprevious surveyed by San Lorenzo within the project:\n \n Cerro Blanco\n \n and\n \n Arco de Oro\n \n .\n \n\n At\n \n Cerro Blanco\n \n the survey\nwill include infill coverage and increased geophysical data from\nbetween the two existing survey lines and expand coverage with\nadditional lines to the north, south, east and the west.\n \n\n At the\n \n Arco de Oro\n \n feature the\nsurvey will extend the geophysical coverage in a northwesterly\ndirection where the feature’s IP signature is strongest and is\nsupported by surface artisanal workings. The survey will also extend\ncoverage to the southeast where additional artisanal workings continue\nfor approximately two additional kilometers.\n \n\n IP data collection is expected to take approximately 40 days with\ninterpretation and reporting up to an additional 14 days, thereafter.\n \n\n San Lorenzo’s VP Exploration, Terence Walker commented:\n \n “The occurrence of\nmineralization during drilling on Cerro Blanco correlated very well\nwith IP.  We look forward to receipt of results from the expanded\ncoverage on Cerro Blanco to confirm the strongest IP anomaly on line 2\n– located east of recently drilled Hole SAL 03–24.  Additionally,\nwe are confident that expanding IP coverage over an extended strike\nlength on the Arco do Oro feature will lead to the delineation of\ncompelling drilling locations on the system.”\n \n\n\n San Lorenzo drilling at Arco de Oro has now intercepted significant\ngold grades over 1.3 kilometers of strike length and at depths up to\n300 meters.  The...