Business
SAGA Metals Completes Phase 1 & Commences Phase 2 of Drilling at Radar Project in Labrador-Confirms Extensive Oxide Mineralization Over 1.5 Km & Provides Corporate Update
VANCOUVER, British Columbia, Dec. 03, 2025 (GLOBE NEWSWIRE) -- SAGA Metals Corp. ("SAGA" or...

About this update from Saga Metals Corp.
[{"type":"text","content":"SAGA Metals Completes Phase 1 & Commences Phase 2 of Drilling at Radar Project in Labrador—Confirms Extensive Oxide Mineralization Over 1.5 Km & Provides Corporate Update\n\n\n\n VANCOUVER, British Columbia, Dec. 03, 2025 (GLOBE NEWSWIRE) --\n \n SAGA Metals Corp.\n \n\n (\"SAGA\" or the \"Company\") (TSXV: SAGA) (OTCQB: SAGMF) (FSE: 20H)\n \n , a North American exploration company advancing critical mineral discoveries, is pleased to announce the successful completion of the first phase of drilling in the Trapper Zone’s northern section (“Trapper North”) including four drill holes over 1,073 m and has initiated phase 2 in the south (“Trapper South”) including two drill holes over 445 m completed to date. Phase 1 and 2 drill holes have intercepted and confirmed extensive oxide mineralization over 1.5 km of the 3+ km strike within the Radar Project’s Trapper Zone.\n \n\n\n Highlights\n \n\n\n\n R-0008, -0009 and -0010 on Drill Section N-11 transected the magnetic anomaly and demonstrated a likely structural repetition of the cumulate oxide layers dominated by semi-massive to massive cumulate oxides, confirming the strong magnetic response.\n \n\n\n R-0008:\n \n Comprising semi-massive to massive oxide mineralization, with a cumulative total of 156 m of core length.\n \n\n\n R-0009:\n \n Over half the length of the hole intersected semi-massive to massive oxide layering, with a cumulative total of 165 m of core length.\n \n\n\n R-0010:\n \n Was drilled off the same drill pad as R-0009 to test the NE limb of the fold. R-0010 contained a cumulative core intercept of 139.5 m of semi-massive to massive oxides, as well as 11.5 m of intercumulus oxide in 251 m of coring.\n \n\n\n R-0011\n \n : Intersected equal portions of semi-massive to massive cumulate oxides and intercumulus oxides. Importantly, the drilling encountered a separate unit of rhythmic banded oxide mineralization.\n \n\n\n R-0012 & R-0013:\n \n Are the first two drill holes of the initial cross section in Trapper South and contains rhythmic oxide layering and further confirms oxide mineralization over 1.5 km of the 3+ km strike within the Trapper Zone.\n \n\n\n\n\n\n\n\n Figure 1:\n \n\n\n Location of the Phase 1 and Phase 2 of Fall 2025 Drilling at Trapper Zone, showing the TMI of the 2025 Trapper Zone ground magnetic...