Business
Sable Intersects 297.7g/t AgEq (283g/t Ag, 0.78% Zn, 0.32% Pb) over 33.3m including 702.13g/t AgEq (579g/t Ag, 1.67% Zn, 0.76% Pb) over 9.9m
Sable Intersects 297.7g/t AgEq (283g/t Ag, 0.78% Zn, 0.32% Pb) over 33.3m including 702.13...

About this update from Sable Resources Ltd.
[{"type":"text","content":"\n\n\n\nSable Intersects 297.7g/t AgEq (283g/t Ag, 0.78% Zn, 0.32% Pb) over 33.3m including 702.13g/t AgEq (579g/t Ag, 1.67% Zn, 0.76% Pb) over 9.9m\n\n/* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n\n\n\n\n\n\n\nCanada NewsWire\nTORONTO, Feb. 28, 2019\n\n\n\nTORONTO, Feb. 28, 2019 /CNW/ - Sable Resources (TSX.V: SAE) (the \"Company\" or \"Sable\") is pleased to announce the first drill results from drillholes M-DDH-19-14 and M-DDH-19-15 from the company's active Stage II 19-hole drill program targeting the Margarita Vein and including the first exploration drillholes in four other veins identified at the Margarita Project, Chihuahua State, Mexico. \nDrillhole M-DDH-19-14 is the first of two infill holes midway between two previously released sections, the first containing drillholes M-DDH-18-05 and M-DDH-18-07 and the second containing drillholes M-DDH-18-06, M-DDH-18-08. Drillhole M-DDH-19-15 is a 250m step out to the southeast from a previously released section containing holes M-DDH-18-04 and M-DDH-18-09.\nHighlights\nM-DDH-19-14297.7 g/t AgEq (283g/t Ag, 0.78% Zn, 0.32% Pb) over 33.3m from 18.75m to 52.05mIncluding702.13 g/t AgEq (579g/t Ag, 1.67% Zn, 0.76% Pb) over 9.9m from 33.55m to 43.45m\nM-DDH-19-15141.25 g/t AgEq (100.86g/t Ag, 0.04% Zn, 0.49g/t Au) over 4.70m from 36.90m to 41.60mIncluding526.78 g/t AgEq (302g/t Ag, 0.04% Zn, 1.73 g/t Au) over 1.2m from 39.65m to 40.85m\n\"We are very pleased to have been able to increase the strike length of the Margarita structure a further 250m to the southeast with Hole M-DDH-19-15.\" commented Ruben Padilla, Vice President of Exploration for Sable. \"Drillhole M-DDH-19-14 is our best intercept to date confirming the high-grade core of the Margarita Vein over considerable thickness with an extensive lower grade halo close to surface\"\nTrue widths are estimated to be 90% of the intercept based on vein to core angle. Detailed drill results, location plan and sections are available from the Sable website (sableresources.com). Silver equivalent is calculated based on USD15.50per ounce for Silver, USD 0.95 per pound fo...