Business
Sable Resumes Oil Flow as Ordered by the Federal DPA with Expected Gross Oil Rate of 50,000 Bbls/d and Expects First Sales by April 1, 2026
HOUSTON, March 16, 2026--Sable Resumes Oil Flow as Ordered by the Federal DPA with Expected Gross Oil Rate of 50,000 Bbls/d and Expects First Sales by April 1, 2026

About this update from Sable Offshore Corp.
[{"type":"text","content":"HOUSTON, March 16, 2026--(BUSINESS WIRE)--Sable Offshore Corp. ("Sable," or the "Company") (NYSE: SOC) today announced that on March 14, 2026, the Company resumed the transportation of hydrocarbons (oil) produced at the Santa Ynez Unit ("SYU") through the federally regulated and approved to operate Santa Ynez Pipeline System ("SYPS") from Las Flores Canyon ("LFC") to Pentland Station at the direction of the United States Secretary of Energy, Chris Wright.","length":509,"tagName":"p"},{"type":"text","content":"On March 13, 2026, President of the United States, Donald J. Trump, signed an Executive Order to, among other things, delegate certain authorities under the Defense Production Act of 1950 ("DPA") to the United States Secretary of Energy. Subsequently on March 13, 2026, the United States Secretary of Energy, Chris Wright, issued an order to Sable invoking the DPA (the "DPA Order") to immediately prioritize and allocate pipeline transportation services for hydrocarbons from the SYU through the SYPS in order to address the energy scarcity and supply disruption risks caused by California policies that have left the region and U.S. military forces dependent on foreign oil. Sable immediately complied with this federal DPA Order and began shipping hydrocarbons from LFC to Pentland Station on March 14, 2026 with federal safety regulators present in observance.","length":884,"tagName":"p"},{"type":"text","content":"As stated in the DPA Order, all federally produced barrels from the SYU must flow through the SYPS, up to the existing pipeline capacity of 200,000 Bbls/d. Sable completed its onshore anomaly repair program and hydrotested all segments of the SYPS consistent with applicable requirements as of May 2025.","length":303,"tagName":"p"},{"type":"text","content":"Prior to resuming hydrocarbon transportation from LFC to Sable’s sales point at Pentland Station, Sable had approximately 540,000 barrels of processed crude oil in storage at LFC, representing more than the line fill volume for the SYPS between LFC and Pentland Station. Sable is fully staffed and will continue to implement the conditions of the Emergency Special Permit previously issued by the United States Department of Transportation, Pipeline and Hazardous Materials Safety Administration.","length"...