Business
Royal Road Minerals Reports First Pass Scout Drilling, Trench and Channel Sample Results from It's Jabal Sahabiyah Project: Kingdom of Saudi Arabia
Toronto, Ontario--(Newsfile Corp. - October 6, 2025) - Royal Road Minerals Limited ( TSXV: RYR ) ...

About this update from Royal Road Minerals Limited
[{"type":"text","content":"Royal Road Minerals Reports First Pass Scout Drilling, Trench and Channel Sample Results from It's Jabal Sahabiyah Project: Kingdom of Saudi ArabiaToronto, Ontario--(Newsfile Corp. - October 6, 2025) - Royal Road Minerals Limited (TSXV: RYR) (OTCQB: RRDMF) (\"Royal Road\" or the \"Company\") is pleased to announce initial scout drilling results and exploratory trench, channel and surface geochemical results from seven separate prospect areas at its Jabal Sahabiyah exploration project in the Kingdom of Saudi Arabia. Drilling, trench and channel sampling, tested four separate occurrences of polymetallic skarn-style and three gold and silver sheeted-vein-style occurrences. Notable results are as follows (see also Table 1):SKARN-STYLE DRILLING INTERSECTIONS JMRC001 - From 0 to 11 meters- 11 meters at 12.3% zinc equiv, or 3.3 g/t gold equiv1FROM: 11 meters at 1.0 g/t gold, 51.3 g/t silver, 0.4% copper, 0.4% lead & 4.9% zinc JMRC006 - From 2 to 17 meters- 15 meters at 1.4 g/t gold equiv, or 1.5% copper equivFROM: 15 meters at 0.7 g/t gold, 3.2 g/t silver, 0.3% copper, 0.5% lead & 1.0% zinc HNRC003 - From 20 to 32 meters- 12 meters at 3.5% zinc equiv, or 90.0 g/t silver equivFROM: 12 meters at 10.0 g/t silver, 0.1% copper & 2.8% zinc SHEETED-VEIN GOLD DRILLING INTERSECTIONS WRRC002 - From 2 to 13 meters- 11 meters at 1.0 g/t gold & 4.6 g/t silver SHEETED-VEIN GOLD TRENCH & CHANNEL INTERSECTIONS WRTR01 - From 57 to 69 meters-  12 meters at 0.9 g/t gold WRTR06 - From 366 to 378 meters- 12 meters at 0.5 g/t gold & 3.2 g/t silver (open across strike) ALTR02 - From 24 to 35.5 meters-11.5 meters at 0.6 g/t gold ASCH01 - From 0 to 11 meters- 11 meters at 0.9 g/t gold (open across strike) ASCH04 - From 5 to 14 meters- 9 meters at 1.3 g/t gold ASCH06 - From 4 to 14 meters- 10 meters at 2.2 g/t gold (open across strike) ASCH07 - From 0 to 11 meters- 11 meters at 0.5 g/t gold (open across strike) (Not true width and the company does not have sufficient information to determine the true widths of the drill hole intersections)TABLE 1: NOTABLE DRILL RESULTS JABAL SAHABIYAHDENOTES TRANSITION TO SULPHIDE INTERSECTIONSGOLDSILVERCOPPERLEADZINCZINC EQGOLD EQSILVER EQCOPPER ...