Business
Canadian Orebodies Extends Mineralization in the Wire Lake Gold System and Commences Summer Work Program at Pic Project
TORONTO, July 31, 2019 (GLOBE NEWSWIRE) -- Canadian Orebodies Inc. (the “Company”) (TSXV:CORE) is pleased to announce the initial results of its sampling progra

About this update from Rocky Shore Gold Limited
[{"type":"text","content":" TORONTO, July 31, 2019 (GLOBE NEWSWIRE) -- Canadian Orebodies Inc. (the “Company”) (TSXV:CORE) is pleased to announce the initial results of its sampling program of historic core and the beginning of surface work at the Pic Project. Crews are now mobilized to the Wire Lake Camp for the fieldwork component, and have been in Timmins for the re-logging and sampling of historic drill core since the end of May. The main objectives of the exploration program are to define the geological controls on higher-grade mineralization in preparation for diamond drilling, and to demonstrate the potential of the Wire Lake Gold System (“WLGS”) to host a large tonnage gold deposit. The geological and assay data collected during this exploration program will improve the continuity of mineralization in the historic holes drilled in the WLGS and will optimize the targeting matrix for future drilling. Highlights: Additional gold discovered in samples taken from previously unsampled intervals in historic holes contain up to 4.36 g/t Au over 0.91m. Gold over 0.1 g/t Au exists in 72 samples taken from historic core. Sampling of historic core is improving the understanding of the continuity of the Wire Lake Gold System. Table 1 – Intersections with Au >= 0.1 g/t discovered in the sampled Wire Lake historic core Hole ID From (m) To (m) Sample Width (m) Year Sampled Sample Number Au (g/t) M-88-18 48.11 49.10 0.99 2016 V388092 0.24 49.10 50.60 1.50 2016 V388093 0.16 M-89-02 46.94 47.85 0.91 2016 V388095 4.36 M-89-07 172.21 173.40 1.19 2016 A371105 1.18 175.56 175.88 0.32 2016 A371106 0.23 M-93-01 12.00 13.50 1.50 2016 V388087 0.16 32.39 33.43 1.04 2019 773914 0.44 33.43 34.50 1.07 2019 773915 2.10 37.00 37.60 0.60 2019 773916 3.53 72.01 73.10 1.09 2019 773918 0.11 73.10 74.20 1.10 2019 773919 0.41 M-93-03 13.50 15.00 1.50 2016 V388056 0.69 21.00 22.50 1.50 2016 V388060 1.21 22.50 24.00 1.50 2016 V388061 0.35 24.00 25.00 1.00 2016 V388062 0.13 25.00 26.00 1.00 2016 V388063 0.95 30.50 32.00 1.50 2016 V388065 0.24 33.50 35.00 1.50 2016 V388067 0.47 35.00 36.50 1.50 2016 V388068 0.46 36.50 37.40 0.90 2016 V388069 0.19 39.60 41.00 1.40 2016 V388070 0.26 56.35 58.00 1.65 2016 V388071 0.71 58.00 59.00 1.00 2016 V388072 0.58 62.70 64.50 1.80 2016 V388073 0.43 65.80 67.00 1.20 2016 V388074 0.35 76.00 77.20 1.20 2019 773955 0.10 77.20 78.45 1.25 2019 773956 0.37 7...