Business
Rock Tech Mobilizes Trenching Crew to Georgia Lake
Rock Tech Mobilizes Trenching Crew to Georgia Lake Canada NewsWire VANCOUVER, Oc...

About this update from Rock Tech Lithium Inc.
[{"type":"text","content":"\n\n\n\n\nRock Tech Mobilizes Trenching Crew to Georgia Lake\n\n/* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n\n\n\n\n\n\n\nCanada NewsWire\nVANCOUVER, Oct. 25, 2018\n\n\n\nVANCOUVER, Oct. 25, 2018 /CNW/ - Rock Tech Lithium Inc. (the \"Company\" or \"Rock Tech\") (TSX-V: RCK; Frankfurt: RJIB) is pleased to announce that it has mobilized a trenching crew to the McVittie area of its 100%-owned Georgia Lake lithium property in the Thunder Bay Mining District of Northwest Ontario, Canada.  \nMartin Stephan, Chief Executive Officer of Rock Tech, commented, \"We are excited to begin the trenching program following up on the positive results from our Preliminary Economic Assessment announced October 2, 2018. The program is aimed at developing drill targets for future resource definition drilling to increase our resource tonnage further and to build up the McVittie area as a second main resource zone of our property.\"\n\nThe McVittie pegmatite, located south of the Nama Creek pegmatite which hosts the majority of the Company's NI 43-101 resource estimate, was the focus of a drill program conducted in 1955 and 1956. In total, twelve (12) holes were drilled over 544 metres. During 2016, ten (10) channels were cut and forty-seven (47) samples taken during a trenching program. The purpose of the channels was to gain information on additional pegmatites observed on surface and to better calibrate future exploration programs. The McVittie pegmatite hosts an inferred resource estimate, prepared in accordance with NI 43-101, of 670,000 tonnes (the Technical Report with resource estimate is available on the Company's website and on SEDAR). \nOn June 27, 2018, the Company announced an updated and upgraded resource estimate for the Georgia Lake lithium property that included the following:\nMeasured: 1.89 million tonnes grading 1.04% lithium oxide (\"Li2O\"); Indicated: 4.68 million tonnes grading 1.00% Li2O; Inferred: 6.72 million tonnes grading 1.16% Li2O.The samples will be analyzed by Actlabs, an ISO 9001:2008 certified analytical laboratory located in Ancaster, Ontario.\nAll scientific ...