World

Rio Tinto provides Iron Ore update following Tropical Cyclone Narelle

PERTH, Australia, March 30, 2026--Rio Tinto's iron ore port operations have resumed after Tropical Cyclone Narelle passed over Western Australia's Pilbara region.

articleRio Tinto PlcMarch 30, 20262/company/rio-tinto-plc/news/rio-tinto-provides-iron-ore-update-following-tropical-cyclone-narelle
Rio Tinto provides Iron Ore update following Tropical Cyclone Narelle

About this update from Rio Tinto Plc

[{"type":"image","alt":"","displaySize":"","headline":null,"caption":"","credit":null,"className":"","disableSlideshowImg":false,"size":{"original":{"width":3840,"height":1524,"url":"https://media.zenfs.com/en/business-wire.com/2458f7cf0ff268b05ca47d86bb494478"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/TuUU.weS6TRUjvZW6qCCfQ--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTM4MQ--/https://media.zenfs.com/en/business-wire.com/2458f7cf0ff268b05ca47d86bb494478","width":960,"height":381},"lightbox":{"url":"https://s.yimg.com/ny/api/res/1.2/5R3ksvgZPPP9P.L5ESVKrA--/YXBwaWQ9aGlnaGxhbmRlcjt3PTI0MDA7aD05NTI-/https://media.zenfs.com/en/business-wire.com/2458f7cf0ff268b05ca47d86bb494478","width":1200,"height":476}},"lazy":false},{"type":"text","content":"PERTH, Australia, March 30, 2026--(BUSINESS WIRE)--Rio Tinto's iron ore port operations have resumed after Tropical Cyclone Narelle passed over Western Australia's Pilbara region.","length":187,"tagName":"p"},{"type":"text","content":"All of the company's people remained safe and unharmed during the weather event.","length":84,"tagName":"p"},{"type":"text","content":"Port closures at Rio Tinto’s four Pilbara iron ore port terminals commenced on 24 March 2026. Ship loading at East Intercourse Island, Parker Point and Cape Lambert B recommenced on 28 March.","length":191,"tagName":"p"},{"type":"text","content":"Damage to Cape Lambert A is currently being repaired. Shipping at that facility is expected to recommence in the coming days.","length":125,"tagName":"p"},{"type":"text","content":"Including Tropical Cyclone Mitchell in February, recent weather events are estimated to have impacted iron ore shipments by approximately 8 million tonnes. The company has identified a pathway to recover around half of these losses.","length":232,"tagName":"p"},{"type":"text","content":"Pilbara iron ore shipment guidance for 2026 remains unchanged at 323 to 338 million tonnes.","length":91,"tagName":"p"},{"type":"text","content":"View source version on businesswire.com: https://www.businesswire.com/news/home/20260329760179/en/","length":98,"tagName":"p"},{"type":"text","content":"Contacts","length":8,"tagName":"p"},{"type":"text","content":"Please direct all enquiries to [email protected]","length":59,"tagName":"p"},{"type":"text","content":"Media Relations, United Kingdom Matthew Klar M +44 7796 630 637David Out...

More updates from Rio Tinto Plc

Rio TintoPERTH, AustraliaWestern AustraliaTropical CycloneMedia RelationsPilbara regionMatt ChambersBUSINESS WIRE