Business
Revival Gold Delivers Compelling PEA Results and Attractive Potential Re-development Timeline for the Mercur Gold Project
TORONTO, March 31, 2025 (GLOBE NEWSWIRE) -- Revival Gold Inc. (TSXV: RVG, OTCQX: RVLGF) (“Revival Gold” or the “Company”) is pleased to announce compelling results from a Preliminary Economic Assessment (“PEA”) on the Company’s Mercur Gold Project (“Mercur” or the “Project”) in Utah, U.S.A. Furthermore, the Project’s favorable mineral tenure, straightforward design and existing infrastructure endowment are expected by Revival Gold and the Company’s consultants to support a relatively short permi
About this update from Revival Gold Inc
[{"type":"image","alt":"Revival Gold Inc.","displaySize":"","headline":null,"caption":"Revival Gold Inc.","className":"","disableSlideshowImg":false,"size":{"original":{"width":204,"height":113,"url":"https://media.zenfs.com/en/globenewswire.com/5d78e2a1ee4d656a37c98d8579f5f682"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/Jl5uQ29BvRpMWUMNegXvjQ--/YXBwaWQ9aGlnaGxhbmRlcjt3PTM2MDtoPTE5OTtjZj13ZWJw/https://media.zenfs.com/en/globenewswire.com/5d78e2a1ee4d656a37c98d8579f5f682","width":204,"height":113}},"lazy":false},{"type":"text","content":"TORONTO, March 31, 2025 (GLOBE NEWSWIRE) -- Revival Gold Inc. (TSXV: RVG, OTCQX: RVLGF) (“Revival Gold” or the “Company”) is pleased to announce compelling results from a Preliminary Economic Assessment (“PEA”) on the Company’s Mercur Gold Project (“Mercur” or the “Project”) in Utah, U.S.A. Furthermore, the Project’s favorable mineral tenure, straightforward design and existing infrastructure endowment are expected by Revival Gold and the Company’s consultants to support a relatively short permitting timeline of approximately two years, putting Mercur on the fast track for potential re-development.","length":605,"tagName":"p"},{"type":"text","content":"Mercur Heap Leach PEA Highlights1","length":33,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"Life-of-mine (“LOM”) production of 65.6 million tonnes (“MT”) of mineralized material at 0.60 grams per tonne (“g/T”) and 75% average recovery generating an average of 95,600 ounces of gold per year over a 10-year mine life;","length":224,"tagName":"p"}]},{"val":[{"type":"text","content":"After-tax NPV at a 5% discount rate (“NPV5%”) of $294 million and after-tax IRR of 27% at a gold price of $2,175 per ounce increasing to a $752 million NPV5% and 57% IRR at a gold price of $3,000 per ounce;","length":221,"tagName":"p"}]},{"val":[{"type":"text","content":"After-tax payback period of 3.6 years at $2,175 per ounce of gold decreasing to 1.7 years at $3,000 per ounce of gold;","length":128,"tagName":"p"}]},{"val":[{"type":"text","content":"Pre-production and working capital of $208 million and additional LOM sustaining capital of $110 million;","length":115,"tagName":"p"}]},{"val":[{"type":"text","content":"LOM average cash cost of $1,205 per ounce of gold and all in sustaining cost of $1,363 per ounce of g...