Business

Radisson Mining announces 5.42 g/t Gold over 15.30 m and 22.96 g/t Gold over 2.40 m, 40 metres west of High-Grade Intercepts recently published in 36E zone; O’Brien project, Cadillac Break

ROUYN-NORANDA, Quebec, Jan. 21, 2019 (GLOBE NEWSWIRE) -- Radisson Mining Resources Inc. (“Radisson” or the “Company") today announced significant high-grade Gol

articleRadisson Mining Resources Inc.January 21, 20194/company/ressources-minieres-radisson-inc/news/radisson-mining-announces-542-gt-gold-over-1530-m-and-2296-gt-gold-over-240-m-40-metres-west-of-high-grade-intercepts-recently-published-in-36e-zone-obrien-project-cadillac-break
Radisson Mining announces 5.42 g/t Gold over 15.30 m and 22.96 g/t Gold over 2.40 m, 40 metres west of High-Grade Intercepts recently published in 36E zone; O’Brien project, Cadillac Break

About this update from Radisson Mining Resources Inc.

[{"type":"text","content":" ROUYN-NORANDA, Quebec, Jan. 21, 2019 (GLOBE NEWSWIRE) -- Radisson Mining Resources Inc. (“Radisson” or the “Company\") today announced significant high-grade Gold intercepts in 36E zone of the O’Brien gold project, located along the Larder-Lake-Cadillac Break halfway between Rouyn-Noranda and Val-d’Or in Quebec, Canada. (See figure 1) Press release highlights: • Drill hole OB-18-85 intersected 5.42 g/t gold over 15.30 metres (“m”) and 22.96 g/t gold over 2.40 m, at similar depth and 40 m west of high-grade intercepts published in November 2018 (See 37.52 g/t Gold over 12.80 m and 8.74 g/t Gold over 12.20 m) • The newly reported intercepts occurred in the 36E zone: 180 metres below and in trend with the projected bulk sample area Where several high-grade gold intercepts were previously obtained (See results from OB-18-84, OB-17-25, OB-17-25w1, OB-17-26 and OB-17-29) (See figure 2, 3 and 4) • Assays are currently pending from approximately 3,850 m of drilling 8 drill holes in the F Zone, located west of current resources • With the second portion of the 2018 drilling campaign now completed, a complete review of litho-structural model is underway for the O’Brien project. “We’re excited by these high-grade gold intercepts, which occurred 180 metres below the projected bulk sample area. These results demonstrate the strong continuity of gold mineralization in the enrichment vector defined in the heart of the O’Brien deposit. In light of recent drill results, a structural reinterpretation is underway for the project as a whole. According to the geological team, structurally controlled faults, possibly conjugated, could control high-grade gold mineralization. Over the next weeks, we will obtain the results from this proposed model”, commented Mario Bouchard, President and CEO. Table 1 Drilling results from Drill hole 18-85 Drill hole From To Length Grade Interpreted zone    (m) (m) (m) Au (g/t)   OB-18-85 388.00 391.00 3.00 5.88 QFP OB-18-85  411.00   426.30   15.30   5.42  Piché Conglomerate Including  411.00   413.00   2.00   8.20  Piché Conglomerate*VG and  421.50   426.30   4.80   8.96  Piché Conglomerate*VG Which includes  423.55   424.50   0.95   ...

More updates from Radisson Mining Resources Inc.