Business
Renforth Resources Drills Gold at Parbec and Sulphides over 2.2 kms. Strike at Surimeau
Parbec Update - includes assay results for Fall 2020 drill program, including 10.75m of 1.54 g/t gold drilled in PAR-20-121 Surimeau Update - includes visual id

About this update from Renforth Resources Inc
[{"type":"text","content":" Parbec Update - includes assay results for Fall 2020 drill program, including 10.75m of 1.54 g/t gold drilled in PAR-20-121 Surimeau Update - includes visual identification of nickel, copper and zinc in each hole drilled over 2.2km strike length at Victoria West PICKERING, ON / ACCESSWIRE / April 13, 2021 / Renforth Resources Inc. (CSE:RFR) (OTCQB:RFHRF) (FSE:9RR) (\"Renforth\" or the \"Company\") is pleased to update shareholders on assay results received for Renforth's 2020 drill program on the wholly owned Parbec open pit constrained gold deposit on the Cadillac Break and visual drill results obtained in the current drill program on the wholly owned Surimeau District nickel rich VMS target at Victoria West, both properties are adjacent to the Canadian Malartic Mine in NW Quebec. This press release gives highlights of assays received for PAR-20-114, PAR-20-118, and a portion of PAR-20-121, all drilled in the Fall 2020 program at Parbec where 9,644m were drilled in phase one of a drill program designed to support a new 2021 resource estimate for Parbec. The drill program finished at 15,569m of drilling completed with the assay results for a total of 35 drill holes in both phase one (Fall 2020) and phase two (Winter 2021) of the program still outstanding. The drill program was designed to fill in gaps within the existing deposit model, to test for the downdip extension of mineralized zones with undercut drillholes and to twin holes drilled between 1986 and 1993 in order to allow the assay results from those 62 holes to be used in the 2021 resource estimate for Parbec, anticipated to be completed in June/July 2021, however, the timeline is dependent on the receipt of assays. The two complete drill holes and one partial drill hole reported on in this press release continue Renforth's success in drilling at Parbec with, again, each hole drilled returning gold values of interest. Each of the results given below are accretive to the overall gold endowment of the Parbec deposit and are expected to positively impact a resource estimate calculation. Parbec Fall 2020 Assay Highlight Table Drillhole From (m) To (m) Length (m) Gold g/t PAR-20-114 315.75 325.9 10.15 0.7 PAR-20-114 331 332.2 1.2 1.02 PAR-20-114 380.5 381 0.5 1.63 PAR-20-114 410.7 411.85 1.15 2.64 PAR-20-118 136.65 138 1.35 0.99 PAR-20-118 194.35 195.85 1.5 2.28 PAR-20-118 1...