Business
Red Lake Gold Inc. Announces 2,715 Line-KM Heli-Borne Geophysical Survey Underway at the Whirlwind Jack Gold Project, Red Lake
VANCOUVER, BC / ACCESSWIRE / September 28, 2020 / Red Lake Gold Inc. (CSE:RGLD) (FWB:P11) ("Red Lake Gold" or the "Corporation") is pleased to announce that it

About this update from Red Lake Gold Inc
[{"type":"text","content":" VANCOUVER, BC / ACCESSWIRE / September 28, 2020 / Red Lake Gold Inc. (CSE:RGLD) (FWB:P11) (\"Red Lake Gold\" or the \"Corporation\") is pleased to announce that it has commenced a large-scale, high-resolution aeromagnetic survey at its Whirlwind Jack Gold Project situated near Red Lake, Ontario. The Whirlwind Jack Gold Project is a district-scale gold exploration project covering more than 21,000 ha across 1,042 mining claims. The project is located adjacent to the 9,140 ha Dixie Gold Project being advanced by Great Bear Resources Ltd. \"Red Lake Gold continues to demonstrate our active exploration focus at our flagship Whirlwind Jack Gold Project near Red Lake, Ontario. We are fortunate to have such a high-impact gold exploration project based on the first 12km of LP Fault strike extent already defined by our geophysical survey last fall. By covering the remainder of our project with high-resolution proprietary geophysics, all of which compliments our in-field exploration, we believe we are set to expand the potential of Red Lake Gold's Whirlwind Jack Gold Project by prospectively delineating additional LP Fault strike-length coverage, which in turn would further increase the magnitude of our target areas for gold exploration. Red Lake Gold's project is an exciting opportunity for our shareholders and we look forward to continuing to advance our exploration efforts,\" stated Ryan Kalt, Chief Executive Officer of Red Lake Gold. About the Geophysical Survey The fall 2020 airborne geophysical survey will cover a planned 2,715 line-kilometres, performed using 50m spacing. Figure 1: Map of the Fall 2020 Geophysical Survey at the Whirlwind Jack Gold Project (coverage area). The heli-borne geophysical survey is being flown in a systematic low-level grid pattern with coverage of the majority of the Whirlwind Jack Gold Project, area of which is located to the west of the mag coverage area previously flown by Red Lake Gold in 2019 (see also news release, Red Lake Gold Inc. Retains Precision GeoSurveys for a 2,715 Line-KM Geophysical Survey at the Whirlwind Jack Gold Project, Red Lake, dated September 14, 2020). The fall 2020 mag survey started at the completion point of the Company's prior 2019 phase one geophysical program (see news release, Red Lake Gold Inc. Commences 2,045 Line KM High-Resolution Aeromagnetic Survey at Whirlwind Jac...