Business
Red Eagle Mining Intersects 1.5 Metres at 26 Grams Gold Per Tonne
Red Eagle Mining Intersects 1.5 Metres at 26 Grams Gold Per Tonne.

About this update from Red Eagle Mining Corp
[{"type":"text","content":"\n\n\n\nRed Eagle Mining Intersects 1.5 Metres at 26 Grams Gold Per Tonne\n\n/* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n\n\n\n\n\n\nRed Eagle Mining Intersects 1.5 Metres at 26 Grams Gold Per Tonne\nPR Newswire\nVANCOUVER, Aug. 1, 2017\n\n\n\nVANCOUVER, Aug. 1, 2017 /PRNewswire/ - Red Eagle Mining Corporation (TSX: R, BVL:R, OTCQX: RDEMF) is pleased to announce results from ongoing underground production stope delineation drilling at the San Ramon Gold Mine, Santa Rosa Gold Project, Antioquia, Colombia.  The results from 95 surface collared ore production stope delineation drill holes (SRD-0001 to SRD-0095) were previously announced.  A total of 15 underground production stope delineation holes have been completed to date (SRDU-0001 to SRDU-0015) with highlights including intersections:\n\n\nSRDU-0003 – 0.60m at 44.14 g/t Au from 45.10m down hole\nSRDU-0008 – 2.25m at 10.04 g/t Au from 82.20m down hole\nSRDU-0008 – 4.75m at 5.38 g/t Au from 97.80m down hole (incl. 0.60m at 27.30 g/t Au)\nSRDU-0010 – 3.80m at 5.35 g/t Au from 58.35m down hole\nSRDU-0011 – 1.50m at 25.92 g/t Au from 85.90m down hole \n\nAs was observed in the surface production stope delineation drilling, the results from the underground production stope delineation drilling have returned intercepts with grades significantly higher than the reserve grade of 5.2 g/t Au.   For complete drilling results, please see Table 1 – Drill Hole Intersections, Table 2 – Drill Hole Specifications, Figure 1– Drill Hole Plan,  Figure 2 and Figure 3 – Cross Sections.  Drill assays were composited by length-weighted averaging into intersections using a 2 g/t Au cut-off grade.  Due to the mining method and mining selectivity contemplated for the deposit, internal dilution was included in some intersections where considered appropriate for mining continuity.  For photographs of the drill core see Red Eagle Mining's photostream on flickr.\n\nQuality Assurance and Quality Control\n\nAll technical information for Red Eagle Mining's Santa Ros...