Business

Q2 Metals Reports Multiple Wide, Mineralized Intercepts at the Cisco Lithium Project, Including 272.5 Metres at 1.61% Li20

Highlights: Three (3) drill holes from the 2025 drill program with strong analytical resu...

articleQ2 Metals CorpSeptember 29, 20253/company/q2-metals-corp/news/q2-metals-reports-multiple-wide-mineralized-intercepts-at-the-cisco-lithium-project-including-2725-metres-at-161percent-li20
Q2 Metals Reports Multiple Wide, Mineralized Intercepts at the Cisco Lithium Project, Including 272.5 Metres at 1.61% Li20

About this update from Q2 Metals Corp

[{"type":"text","content":"Q2 Metals Reports Multiple Wide, Mineralized Intercepts at the Cisco Lithium Project, Including 272.5 Metres at 1.61% Li20\n\n\n\n\n Highlights:\n \n\n\n\n Three (3) drill holes from the 2025 drill program with strong analytical results are reported herein:\n \n\n CS25-036: nine (9) separate intervals, the widest being\n \n 272.5 m\n \n at\n \n 1.61% Li\n \n\n\n 2\n \n\n\n O.\n \n\n\n\n\n\n\n CS25-038: 17 separate intervals, the widest being\n \n 66.5 m\n \n at\n \n 1.55% Li\n \n\n\n 2\n \n\n\n O\n \n and\n \n\n 58.9 m\n \n at\n \n 1.09% Li\n \n\n\n 2\n \n\n\n O\n \n .\n \n\n\n\n CS25-039: 12 separate intervals, including:\n \n\n\n\n\n 108.5 m\n \n at\n \n 1.62% Li\n \n\n\n 2\n \n\n\n O\n \n ,\n \n\n\n 71.0 m\n \n at\n \n 1.84% Li\n \n\n\n 2\n \n\n\n O,\n \n\n\n\n 77.7 m\n \n at\n \n 1.48% Li\n \n\n\n 2\n \n\n\n O, and\n \n\n\n\n 107.4 m\n \n at\n \n 1.87% Li\n \n\n\n 2\n \n\n\n O\n \n\n\n\n\n\n\n\n\n Three (3) drill rigs continue to operate on the Cisco Project, with a fourth scheduled to start at the end of October 2025.\n \n\n\n\n The upcoming drilling programs will be primarily focused on infill-scale drilling within the main mineralized zone, supporting the Company’s efforts to deliver an initial inferred Mineral Resource Estimate in the first half of 2026.\n \n\n\n\n VANCOUVER, British Columbia, Sept. 29, 2025 (GLOBE NEWSWIRE) --\n \n Q2 Metals Corp. (TSX.V: QTWO | OTCQB: QUEXF | FSE: 458)\n \n (“\n \n Q2\n \n ” or the “\n \n Company\n \n ”) is pleased to report assay results from the ongoing 2025 drill program (the “\n \n 2025 Drill Program\n \n ”) at the Company’s Cisco Lithium Project (the “\n \n Project\n \n ” or the “\n \n Cisco Project\n \n ”), located within the greater Nemaska traditional territory of the Eeyou Istchee James Bay region of Quebec, Canada.\n \n\n “\n \n Hole 36, with its 272.5 metres of continuous spodumene pegmatite grading 1.61% Li\n \n\n\n 2\n \n\n\n O is a significant confirmation of the substantial width of the Mineralized Zone, especially when considered alongside intervals such as the 347 metres of continuous spodumene pegmatite in Hole 21,”\n \n said Neil McCallum, Vice President of Exploration for Q2 Metals.\n \n “Importantly, the Mineralized Zone remains open at depth and along stri...

More updates from Q2 Metals Corp