Business

Q2 Metals Intercepts 151 Metres of Continuous Spodumene Pegmatite at the Cisco Lithium Project in Quebec, Canada and Announces Option Payments on Cisco Project Properties

Highlights The 2025 Summer Drill Program is underway with a focus on infill drilling of...

articleQ2 Metals CorpJune 24, 20255/company/q2-metals-corp/news/q2-metals-intercepts-151-metres-of-continuous-spodumene-pegmatite-at-the-cisco-lithium-project-in-quebec-canada-and-announces-option-payments-on-cisco-project-properties
Q2 Metals Intercepts 151 Metres of Continuous Spodumene Pegmatite at the Cisco Lithium Project in Quebec, Canada and Announces Option Payments on Cisco Project Properties

About this update from Q2 Metals Corp

[{"type":"text","content":"Q2 Metals Intercepts 151 Metres of Continuous Spodumene Pegmatite at the Cisco Lithium Project in Quebec, Canada and Announces Option Payments on Cisco Project Properties\n\n\n\n\n\n Highlights\n \n\n\n\n\n The 2025 Summer Drill Program is underway with a focus on infill drilling of the main mineralized zone.\n \n\n The program commenced with the continuation of hole CS-25-036 which, as\n \n reported on June 10, 2025\n \n encountered nine (9) separate intervals, the widest being 64.3 m at 1.34% Li\n \n 2\n \n O before being stopped at a depth of 315.3 m.\n \n\n Follow-up drilling on Hole 36 has intercepted three (3) additional spodumene intervals, with the widest continuous interval being 151.0 metres, along with intervals of 64.3 m and 52.1 m.\n \n\n\n\n VANCOUVER, British Columbia, June 24, 2025 (GLOBE NEWSWIRE) --\n \n Q2 Metals Corp. (TSX.V: QTWO | OTCQB: QUEXF | FSE: 458)\n \n (“\n \n Q2\n \n ” or the “\n \n Company\n \n ”) is pleased to announce that drilling has commenced at the Cisco Lithium Project (the “\n \n Project\n \n ” or the “\n \n Cisco Project\n \n ”) located within the greater Nemaska traditional territory of Eeyou Istchee James Bay region of Quebec, Canada. The Cisco Project is transected by the paved Billy Diamond Highway and just 150 kilometres (“km”) north of the Canadian National Railway in the town of Matagami.\n \n\n The primary objective of the 2025 summer drill program (“\n \n 2025 Summer Program\n \n ”) is infill drilling of the 1.5 km of northeast-southwest trending mineralized strike length.\n \n\n The 2025 Summer Program commenced with a continuation of hole CS-25-036 (“Hole 36”), which was paused at a depth of 315.3 metres (“m”) at the end of the 2025 winter drill program. Hole 36 has now been completed to depth of 582.11 m over which it intersected an additional three (3) spodumene pegmatite intervals, with the widest continuous interval of 151.0 m.\n \n\n\n “The first hole completed as part of the 2025 Summer Program has exceeded expectations by extending the depth of the main mineralized zone beyond what was previously known and ranks as the best hole of the Project in terms of total spodumene pegmatite intersected, to date,\n \n ” said Q2 VP Exploration Neil McCallum.\...

More updates from Q2 Metals Corp