Business
Q2 Metals Expands Major Lithium Zone at the Cisco Lithium Project: Hole 27 Drilled 179.6 Metres at 1.66% Li₂O, 58.0 Metres at 1.75% Li₂O, and 91.8 Metres at 1.81% Li₂O
Highlights: Assay results from four (4) drill holes from the 2025 Winter Program at the Cisco Lithium Project with strong analytical results are reported herein, including: CS25-027: Three major intervals: 179.6 m at 1.66% Li2O; 58 m at 1.75% Li2O; and91.8 m at 1.81% Li2O. CS25-024A: Widest interval of 39.5 m at 1.16% Li2O.CS25-025: Widest interval of 29.0 m at 1.10% Li2O.CS25-026: Widest interval of 23.9 m at 1.46% Li2O. Assays for the 10 remaining drill holes from the winter program are pendin
About this update from Q2 Metals Corp
[{"type":"image","alt":"Q2 Metals Corp","displaySize":"","headline":null,"caption":"Q2 Metals Corp","className":"","disableSlideshowImg":false,"size":{"original":{"width":300,"height":119,"url":"https://media.zenfs.com/en/globenewswire.com/b06518973426538c092d98295c7a43d5"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/UzLr5fAPg1hI_ko9D_52YA--/YXBwaWQ9aGlnaGxhbmRlcjt3PTQyMDtoPTE2NztjZj13ZWJw/https://media.zenfs.com/en/globenewswire.com/b06518973426538c092d98295c7a43d5","width":300,"height":119}},"lazy":false},{"type":"text","content":"Highlights:","length":11,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"Assay results from four (4) drill holes from the 2025 Winter Program at the Cisco Lithium Project with strong analytical results are reported herein, including:","length":160,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"CS25-027: Three major intervals:","length":32,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"179.6 m at 1.66% Li2O; ","length":22,"tagName":"p"}]},{"val":[{"type":"text","content":"58 m at 1.75% Li2O; and","length":23,"tagName":"p"}]},{"val":[{"type":"text","content":"91.8 m at 1.81% Li2O.","length":21,"tagName":"p"}]}],"tagName":"ul","bulletedList":true,"length":66,"olType":false}]},{"val":[{"type":"text","content":"CS25-024A: Widest interval of 39.5 m at 1.16% Li2O.","length":51,"tagName":"p"}]},{"val":[{"type":"text","content":"CS25-025: Widest interval of 29.0 m at 1.10% Li2O.","length":50,"tagName":"p"}]},{"val":[{"type":"text","content":"CS25-026: Widest interval of 23.9 m at 1.46% Li2O.","length":50,"tagName":"p"}]}],"tagName":"ul","bulletedList":true,"length":249,"olType":false}]}],"tagName":"ul","bulletedList":true,"length":409,"olType":false},{"type":"list","items":[{"val":[{"type":"text","content":"Assays for the 10 remaining drill holes from the winter program are pending.","length":76,"tagName":"p"}]}],"tagName":"ul","bulletedList":true,"length":76,"olType":false},{"type":"text","content":"VANCOUVER, British Columbia, May 27, 2025 (GLOBE NEWSWIRE) -- Q2 Metals Corp. (TSX.V: QTWO | OTCQB: QUEXF | FSE: 458) (“Q2” or the “Company”) is pleased to report initial assay results from the Winter 2025 drill program (the “2025 Winter Program”) at the Company’s Cisco Lithium Project (the “Project” or the “Cisco Project”), located within the greater...