Business

Q2 Metals Expands Major Lithium Zone at the Cisco Lithium Project: Hole 27 Drilled 179.6 Metres at 1.66% Li?O, 58.0 Metres at 1.75% Li?O, and 91.8 Metres at 1.81% Li?O

Highlights: Assay results from four (4) drill holes from the 2025 Winter Program at the C...

articleQ2 Metals CorpMay 27, 20253/company/q2-metals-corp/news/q2-metals-expands-major-lithium-zone-at-the-cisco-lithium-project-hole-27-drilled-1796-metres-at-166percent-lio-580-metres-at-175percent-lio-and-918-metres-at-181percent-lio
Q2 Metals Expands Major Lithium Zone at the Cisco Lithium Project: Hole 27 Drilled 179.6 Metres at 1.66% Li?O, 58.0 Metres at 1.75% Li?O, and 91.8 Metres at 1.81% Li?O

About this update from Q2 Metals Corp

[{"type":"text","content":"Q2 Metals Expands Major Lithium Zone at the Cisco Lithium Project: Hole 27 Drilled 179.6 Metres at 1.66% Li₂O, 58.0 Metres at 1.75% Li₂O, and 91.8 Metres at 1.81% Li₂O \n\n\n\n\n Highlights:\n \n\n\n\n Assay results from four (4) drill holes from the 2025 Winter Program at the Cisco Lithium Project with strong analytical results are reported herein, including:\n \n\n CS25-027: Three major intervals:\n \n\n\n 179.6 m at 1.66% Li\n \n\n\n 2\n \n\n\n O;\n \n\n\n\n 58 m at 1.75% Li\n \n\n\n 2\n \n\n\n O; and\n \n\n\n\n 91.8 m at 1.81% Li\n \n\n\n 2\n \n\n\n O.\n \n\n\n\n\n CS25-024A: Widest interval of\n \n 39.5 m at 1.16% Li\n \n\n\n 2\n \n\n\n O\n \n .\n \n\n CS25-025: Widest interval of\n \n 29.0 m at 1.10% Li\n \n\n\n 2\n \n\n\n O\n \n .\n \n\n CS25-026: Widest interval of\n \n 23.9 m at 1.46% Li\n \n\n\n 2\n \n\n\n O\n \n .\n \n\n\n\n\n\n Assays for the 10 remaining drill holes from the winter program are pending.\n \n\n\n\n VANCOUVER, British Columbia, May 27, 2025 (GLOBE NEWSWIRE) --\n \n Q2 Metals Corp. (TSX.V: QTWO | OTCQB: QUEXF | FSE: 458)\n \n (“\n \n Q2\n \n ” or the “\n \n Company\n \n ”) is pleased to report initial assay results from the Winter 2025 drill program (the “\n \n 2025 Winter Program\n \n ”) at the Company’s Cisco Lithium Project (the “\n \n Project\n \n ” or the “\n \n Cisco Project\n \n ”), located within the greater Nemaska traditional territory of the Eeyou Istchee James Bay region of Quebec, Canada.\n \n\n A total of 6,980 metres (“m”) was drilled over 14 drill holes during the 2025 Winter Program at the Cisco Project, with the analytical results reported herein representing 2,381 m of drilling over the first four (4) holes.\n \n\n Hole CS25-027 (“Hole 27”) was a large step out designed to test the continuity of the main mineralized zone to the south and was collared 430 m south of previously drilled hole CS24-023 (“Hole 23”), which contained a wide interval of 188.6 m of continuous spodumene pegmatite at 1.56% Li\n \n 2\n \n O (as announced\n \n December 9, 2024\n \n ). The intervals of Hole 27 are located 200 m to the south of the intervals of Hole 23, thus successfully confirming and extending the continuity of the wide mineralized zone to the south to app...

More updates from Q2 Metals Corp