Business

Q2 Metals Defines Initial Exploration Target of 215 to 329 Million Tonnes at the Cisco Lithium Project in James Bay, Quebec, Canada

Highlights The initial Exploration Target estimates a range of lithium mineralization a...

articleQ2 Metals CorpJuly 21, 20253/company/q2-metals-corp/news/q2-metals-defines-initial-exploration-target-of-215-to-329-million-tonnes-at-the-cisco-lithium-project-in-james-bay-quebec-canada
Q2 Metals Defines Initial Exploration Target of 215 to 329 Million Tonnes at the Cisco Lithium Project in James Bay, Quebec, Canada

About this update from Q2 Metals Corp

[{"type":"text","content":"Q2 Metals Defines Initial Exploration Target of 215 to 329 Million Tonnes at the Cisco Lithium Project in James Bay, Quebec, Canada \n\n\n\n\n\n Highlights\n \n\n\n\n\n The initial Exploration Target estimates a range of lithium mineralization at the Cisco Project from\n \n 215 to 329 Mt at a grade ranging from 1.0 to 1.38 % Li\n \n 2\n \n O.\n \n\n\n\n\n Based only on the first 40 holes drilled to date.\n \n\n\n\n Drill testing continues with mineralization open at depth and along strike with potential for significant expansion at the Cisco Mineralized Zone.\n \n\n\n\n The 2025 Summer Program is ongoing, with rolling assay results anticipated into Q3 2025 as the Company works towards a maiden resource estimate.\n \n\n\n\n The Exploration Target was completed by BBA Inc., an independent geological and engineering consulting firm, and is based on exploration and drilling to date.\n \n\n\n VANCOUVER, British Columbia, July 21, 2025 (GLOBE NEWSWIRE) --\n \n Q2 Metals Corp. (TSX.V: QTWO | OTCQB: QUEXF | FSE: 458)\n \n (“\n \n Q2\n \n ” or the “\n \n Company\n \n ”) is pleased to announce an inaugural Exploration Target on the Cisco Lithium Project (the “\n \n Project\n \n ” or the “\n \n Cisco Project\n \n ”), located within the greater Nemaska traditional territory of the Eeyou Istchee James Bay region of Quebec, Canada.\n \n\n The estimated range of potential mineralization and grade is from\n \n 215 to 329 million tonnes\n \n (“Mt”)\n \n at a grade ranging from 1.0 to 1.38 % Li\n \n\n\n 2\n \n\n\n O\n \n :\n \n\n\n\n\n\n\n\n\n Tonnes Range (Mt)\n \n\n\n\n Li\n \n\n\n 2\n \n\n\n O Range (%)\n \n\n\n\n\n\n Minimum\n \n\n\n\n Maximum\n \n\n\n\n Minimum\n \n\n\n\n Maximum\n \n\n\n\n\n\n Exploration Target\n \n\n\n 215\n \n\n 329\n \n\n 1.00\n \n\n 1.38\n \n\n\n\n Table 1: Exploration Target for Cisco Mineralized Zone\n \n\n The potential quantity and grade of the Exploration Target are conceptual in nature. There has been insufficient exploration to estimate and define a Mineral Resource, as defined by National Instrument 43-101\n \n Standards of Disclosure for Mineral Project\n \n (“\n \n NI 43-101\n \n ”), and it is uncertain if further exploration will result in the target being delineated as a Mineral Resource.\n \n\n An Exploration Target is used...

More updates from Q2 Metals Corp