Business

Purepoint and IsoEnergy Joint Venture Approves 2026 Program to Advance the Nova Discovery at the Dorado Project

Toronto, Ontario--(Newsfile Corp. - December 4, 2025) - Purepoint Uranium Group Inc. (TSXV: PTU)...

articlePurepoint Uranium Group Inc.December 4, 20255/company/purepoint-uranium-group-inc/news/purepoint-and-isoenergy-joint-venture-approves-2026-program-to-advance-the-nova-discovery-at-the-dorado-project
Purepoint and IsoEnergy Joint Venture Approves 2026 Program to Advance the Nova Discovery at the Dorado Project

About this update from Purepoint Uranium Group Inc.

[{"type":"text","content":"Purepoint and IsoEnergy Joint Venture Approves 2026 Program to Advance the Nova Discovery at the Dorado ProjectToronto, Ontario--(Newsfile Corp. - December 4, 2025) - Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) today announced that the Purepoint and IsoEnergy Joint Venture has approved an expanded exploration program for 2026 following strong results from this year's drilling at the Dorado Project. The Nova discovery (\"Nova Discovery\" or \"Nova\") returned uranium grades up to 8.1% U₃O₈ over 0.4 metre within 2.1 metres of 1.6% U₃O₈ in hole PG25-07A confirming a steeply dipping uranium bearing structure that remains open in all directions (see news release dated September 18, 2025). \"The joint venture's approval of the 2026 program reflects the significance of the Nova Discovery,\" said Chris Frostad, President and CEO of Purepoint Uranium Group. \"Each step out delivered stronger mineralization, and the open northeastern extension has become our priority. The coming year allows us to advance Nova with purpose and begin evaluating additional high priority zones across the Dorado Project.\"Highlights:The joint venture approved a dedicated exploration program to advance the Dorado Project (Figure 4) following up on this year's Nova Discovery which returned assays of 8.1% U3O8 over 0.4 metre within 2.1 metres of 1.6% U3O8 The approved program includes 17 holes totalling 7,450 metres across winter and summer campaignsWinter 2026 drill program (January - March) will focus on expanding Nova with 10 holes totalling approximately 4,300 metres District-scale summer 2026 drill campaign (July - August) will test priority targets with 7 holes totalling approximately 3,150 metresAirborne magnetotellurics survey is planned for late winter or springWinter access and wetland drill pads will be established this month including 8 km of existing trail and 10 km of new trail constructionProgram SummaryWinter 2026 - Nova ExpansionThe winter drill program aims to advance the Nova Discovery with 10 skidder supported drill holes totaling 4,300 metres. Drilling will initially focus on the corridor between PG25-03 and PG25-07A, a distance of 800 metres, with 30 to 50 metre step outs to the northeast where the strongest mineralization was encountered. The Nova mineralization remains open in all directions.Airborne...

More updates from Purepoint Uranium Group Inc.