Business

Re-transmission: Ethos Announces Re-assay of Pine Pass trenches includes 130 m of 0.54% V2O5 within 213 m of 0.47% V2O5

Vancouver, British Columbia--(Newsfile Corp. - January 10, 2019) - Ethos Gold Corp. (TSXV: ...

articleProspector Metals CorpJanuary 10, 20194/company/prospector-metals-corp/news/re-transmission-ethos-announces-re-assay-of-pine-pass-trenches-includes-130-m-of-054percent-v2o5-within-213-m-of-047percent-v2o5
Re-transmission: Ethos Announces Re-assay of Pine Pass trenches includes 130 m of 0.54% V2O5 within 213 m of 0.47% V2O5

About this update from Prospector Metals Corp

[{"type":"text","content":"Re-transmission: Ethos Announces Re-assay of Pine Pass trenches includes 130 m of 0.54% V2O5 within 213 m of 0.47% V2O5Vancouver, British Columbia--(Newsfile Corp. - January 10, 2019) - Ethos Gold Corp. (TSXV: ECC) (OTCQB: ETHOF) (\"Ethos\" or the \"Company\") has now received lithium metaborate fusion assay results for all assays from Trenches 18PPT1 and 18PPT2 on its Pine Pass vanadium project located in north-eastern British Columbia. The lithium metaborate fusion assay allows for more complete digestion of mineral species versus the ICP-MS with 4 acid-digestion method that was previously used, as discussed in the Company's December 6 and 12, 2018 news releases.As illustrated below, trenches 18PPT1 and 18PPT2 are located approximately 1.1 km apart along a portion of the east limb syncline vanadiferous horizon subcrop (see corporate presentation at www.ethosgold.com). There is approximately 20 km of prospective subcrop horizon on the Pine Pass property and the planned 2019 exploration program will continue to explore these subcrop horizons including a drill campaign between and north and south of trenches 18PPT1 and 18PPT2.Figure 1To view an enhanced version of Figure 1, please visit:https://orders.newsfilecorp.com/files/1564/42030_efd0ee798421091f_002full.jpgTrench 18PPT2The previously reported and new re-assay results for Trench 18PPT2 are summarized below: LengthPrevious Fusion(m)(%V2O5)(%V2O5)29 m0.45%0.52%offset in trench130m0.48%0.54% These revised assays for Trench 18PPT2 are plotted on the cross section below:Figure 2. Trench 18PPT2To view an enhanced version of Figure 2, please visit:https://orders.newsfilecorp.com/files/1564/42030_efd0ee798421091f_003full.jpgTrench 18PPT1 The previously reported and new re-assay results for Trench 18PPT1 are summarized below: LengthPrevious Fusion(m)(%V2O5)(%V2O5)150.44%0.49%10unable to get to bedrock230.47%0.55%250.25%0.29%270.45%0.52% These revised assays for Trench 18PPT1 are plotted on the cross section below:Figure 3. Trench 18PPT1To view an enhanced version of Figure 3, please visit:https://orders.newsfilecorp.com/files/1564/42030_efd0ee798421091f_004full.jpgSummaryThe lithium metaborate fusion results for trench 18PPT2 were on average 11% higher versus the ICP-MS with 4 acid-digestion method and for trench 18PPT1 were on average 13% higher.QA/QC, Qualified Person, an...

More updates from Prospector Metals Corp