Business
Ethos Trenches 0.48% V2O5 Over 130 m at Pine Pass Vanadium Project
Vancouver, British Columbia--(Newsfile Corp. - November 1, 2018) - Ethos Gold Corp. (TSXV: E...

About this update from Prospector Metals Corp
[{"type":"text","content":"Ethos Trenches 0.48% V2O5 Over 130 m at Pine Pass Vanadium ProjectVancouver, British Columbia--(Newsfile Corp. - November 1, 2018) - Ethos Gold Corp. (TSXV: ECC) (OTCQB: ETHOF) (\"Ethos\" or the \"Company\") is pleased to announce the completion of the 2018 sampling and trenching program (Phase 2 work) and to provide initial trench results for its Pine Pass vanadium project, located on the John Hart Highway, north-eastern British Columbia approximately 70 kilometers west of Chetwynd, and 200 kilometers north of Prince George.Following up on initial soil, rock, and stream sediment sampling (see September 25, 2018 press release), five trenches were hand dug at Pine Pass in September and early October 2018. Trenches 18PPT1, 2 and 5 were hand dug across the projected east limb of the host syncline which dips approximately 45-50˚ to the west. Trenches 18PPT3 and 4 were dug across the projected west limb which dips approximately 50-60˚ to the east. Additionally, a line of continuous rock chip sampling (18MST1) was completed across the west limb mineralized horizon on a road cut on the John Hart Highway. A 100 m interval in Trench 1 (18PPT1) on the eastern syncline limb subcrop (see Figure 1) returned the following results (continuous along trench):Length (m) V2O5 Grade15 0.44%10 unable to get to bedrock23 0.47%25 0.25%27 0.45%100  This interval is contained within a broader mineralized envelope: in Trench 1 there were cumulative sample intervals (not continuous: there is one 10m and one 7m gap) of 255 m averaging 0.27% V2O5. Trench 2 (18PPT2) located approximately 1.1 km south east of Trench 1 also on the eastern limb subcrop (see Figure 1) returned the following results: Length (m)V2O5 Grade 290.45% offset in trench 1300.48% 159 These Trench 2 intervals are also contained within a broader mineralized envelope: in Trench 2 there were cumulative sample intervals (not continuous: there is one offset gap and one 10m gap) of 218 m averaging 0.43% V2O5. The beds in Trenches 1 and 2 are dipping approximately 45-50˚ to the south-west and the sampled intervals will have to be adjusted to true width. The trenches appear to be oriented approximately parallel to the dip direction (perpendicular to strike). While it is very preliminary true widths of the mineralized beds may be in the range ...