Business
PROPWR Signs Long-Term 60 Megawatt Power Contract for Hyperscaler Data Center, Leveraging Hybrid Energy Storage Technology
MIDLAND, Texas, October 27, 2025--PROPWR Signs Long-Term 60 Megawatt Power Contract for Hyperscaler Data Center, Leveraging Hybrid Energy Storage Technology
About this update from Propetro Holding Corp.
[{"type":"image","alt":"","displaySize":"","headline":null,"caption":"","credit":null,"className":"","disableSlideshowImg":false,"size":{"original":{"width":1024,"height":512,"url":"https://media.zenfs.com/en/business-wire.com/f6d30dfc530fcf707fda442ff9e57939"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/Da44qRE9wLIsO8V4wAU4FQ--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTQ4MDtjZj13ZWJw/https://media.zenfs.com/en/business-wire.com/f6d30dfc530fcf707fda442ff9e57939","width":960,"height":480},"lightbox":{"url":"https://s.yimg.com/ny/api/res/1.2/38OVa7h3xnuZdZ_GUOufuw--/YXBwaWQ9aGlnaGxhbmRlcjt3PTIwNDg7aD0xMDI0O2NmPXdlYnA-/https://media.zenfs.com/en/business-wire.com/f6d30dfc530fcf707fda442ff9e57939","width":1024,"height":512}},"lazy":false},{"type":"text","content":"MIDLAND, Texas, October 27, 2025--(BUSINESS WIRE)--ProPetro Holding Corp. ("ProPetro" or the "Company") (NYSE: PUMP) is pleased to announce that its PROPWR℠ division has secured a long-term power supply contract to commit 60 megawatts of reliable energy to support a leading hyperscaler data center operator in the Midwest region of the United States. This agreement marks a major milestone in the company’s growth strategy and establishes a commercial relationship and strategic alignment with one of the industry’s largest data infrastructure players.","length":573,"tagName":"p"},{"type":"text","content":"Under the terms of the contract, PROPWR will deploy an innovative hybrid energy system that combines battery energy storage solution (BESS) technology with high-efficiency natural gas reciprocating engine generators. This advanced configuration is designed to effectively manage rapid load swings, ensuring continuous, stable power delivery while enhancing grid resiliency and operational flexibility.","length":401,"tagName":"p"},{"type":"text","content":"Deployment and operations are slated to begin in Q2 2026, an accelerated timeline that positions PROPWR to be ahead of industry competitors in terms of speed-to-market and execution.","length":182,"tagName":"p"},{"type":"text","content":""This agreement showcases our commitment to delivering cutting-edge, dependable power solutions tailored to the evolving demands of data center infrastructure development," said Travis Simmering, President of PROPWR. "By integrating hybrid battery storage with reciprocating engine techn...