Business

Power Metals Intersects Significant Lithium Mineralization in First Thousand Metres of Case Lake Drill Program

VANCOUVER, BRITISH COLUMBIA--(Marketwired - Sept. 21, 2017) - Power Metals Corp. ("Power Metals Corp." or the "Company") (TSX VENTURE:PWM) (FRANKFURT:OAA1) is p

articlePower Metals Corp.September 21, 20173/company/power-metals-corp/news/power-metals-intersects-significant-lithium-mineralization-in-first-thousand-metres-of-case-lake-drill-program
Power Metals Intersects Significant Lithium Mineralization in First Thousand Metres of Case Lake Drill Program

About this update from Power Metals Corp.

[{"type":"text","content":"VANCOUVER, BRITISH COLUMBIA--(Marketwired - Sept. 21, 2017) - Power Metals Corp. (\"Power Metals Corp.\" or the \"Company\") (TSX VENTURE:PWM) (FRANKFURT:OAA1) is pleased to announce that ongoing drilling has successfully intersected significant lithium mineralization at the Company's Case Lake Property. Power Metals has an 80% interest with its 20% working interest partner MGX Minerals Corp. (CSE:XMG) (CSE:XMG.CN) (CNSX:XMG). The Case Lake drill target area consists of a pegmatite dyke swarm: North, Main and South Dykes as well as multiple unnamed pegmatite dykes. Drill hole PWM-17-08 intersected 35.22 m of continuous spodumene pegmatite as part of the Main Dyke with very coarse-grained spodumene crystals up to 10 cm long. A total of 12 drill holes have been drilled to date. With the exception of hole 3, all drill holes intersected spodumene bearing pegmatite (Table 1, Figure 7). Assays are pending. The drill program targeted downdip extension of North, Main and South Dykes in an area of known mineralization and the east and west along strike extension of the three Dykes in areas with no previous drill holes. This drill program has also successfully drilled the first ever holes on the South Dyke. Johnathan More, Chairman of Power Metals stated, \"We couldn't be more pleased with our progress on the drill program to date and eagerly await assay results to confirm our interpretation of the potential tonnage and grade at Case Lake. With our drill program set for a minimum of 5,000 metres, we expect the balance of the drill program to be completed by the end of October, at which point we will quickly aim to deliver a 43-101 compliant resource calculation to the market.\" Preliminary highlights include: Drill holes PWM-17-08, 09 and 10 are the best drill holes of the program so far (Table 2). These holes were designed to test the up and down dip extension of the Main Dyke. PWM-17-08 intersected continuous spodumene pegmatite from 18.86 to 54.08 m for an interval of 35.22 m of the Main Dyke (Figures 1 and 2). PWM-17-09 intersected continuous spodumene pegmatite from 26.5 to 60.0 m for an interval of 33.5 m of the Main Dyke. This intersection included a 42 cm long x 2 cm wide pale green spodumene blade (Figures 3 to 6). PWM-17-10 intersected spodumene pegmatite from 33.83 to 62.05 m for an interval of 28.22 m of Main Dyke. This interv...

More updates from Power Metals Corp.