Business

Case Lake Drilling Intersects 1.42% Li2O and 158 ppm Ta Over 19.17 m

Case Lake Drilling Intersects 1.42% Li2O and 158 ppm Ta Over 19.17 m Canada NewsWi...

articlePower Metals Corp.August 21, 20183/company/power-metals-corp/news/case-lake-drilling-intersects-142percent-li2o-and-158-ppm-ta-over-1917-m
Case Lake Drilling Intersects 1.42% Li2O and 158 ppm Ta Over 19.17 m

About this update from Power Metals Corp.

[{"type":"text","content":"\n\n\n\nCase Lake Drilling Intersects 1.42% Li2O and 158 ppm Ta Over 19.17 m\n\n/* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prngen3{\nBORDER-BOTTOM:black 0pt; BORDER-LEFT:black 0pt; PADDING-LEFT:0.50em; PADDING-RIGHT:0.50em; VERTICAL-ALIGN: BOTTOM; BORDER-TOP:black 0pt; BORDER-RIGHT:black 0pt\n}\n.prngen1{\nBORDER-BOTTOM:0pt; BORDER-LEFT:0pt; BORDER-COLLAPSE: COLLAPSE; BORDER-TOP:0pt; BORDER-RIGHT:0pt\n}\n.prngen5{\nBORDER-BOTTOM:black 1pt solid; TEXT-ALIGN: RIGHT; BORDER-LEFT:black 0pt; PADDING-LEFT:0.50em; PADDING-RIGHT:0.50em; VERTICAL-ALIGN: BOTTOM; BORDER-TOP:black 0pt; BORDER-RIGHT:black 0pt\n}\n.prngen4{\nBORDER-BOTTOM:black 0pt; TEXT-ALIGN: RIGHT; BORDER-LEFT:black 0pt; PADDING-LEFT:0.50em; PADDING-RIGHT:0.50em; VERTICAL-ALIGN: BOTTOM; BORDER-TOP:black 0pt; BORDER-RIGHT:black 0pt\n}\n.prngen2{\nBORDER-BOTTOM:black 1pt solid; BORDER-LEFT:black 0pt; PADDING-LEFT:0.50em; PADDING-RIGHT:0.50em; VERTICAL-ALIGN: BOTTOM; BORDER-TOP:black 0pt; BORDER-RIGHT:black 0pt\n}\n\n\n\n\n\n\n\nCanada NewsWire\nVANCOUVER, Aug. 21, 2018\n\n\n\nVANCOUVER, Aug. 21, 2018 /CNW/ - Power Metals Corp. (\"Power Metals Corp.\" or the \"Company\") (TSX VENTURE:PWM)(FRANKFURT:OAA1)(OTC:PWRMF) is pleased to announce assays from the first 8 drill holes on the Company's current 15,000 m drill program at its Case Lake Property, 80 km east of Cochrane, Ontario. Drill hole PWM-18-84 intersected 1.42% Li2O and 158 ppm Ta over 19.17 m on the Main Dyke. The same hole also intersected 1.17% Li2O and 193 ppm Ta over 27.16 m. These two high-grade spodumene pegmatite intervals are separated by the quartz core. The purpose of this longitudinal drill hole was to test the continuity of the Main Dyke along strike and down dip. PWM-18-84 intersected continuous pegmatite from 2.0 - 128.25 m.\n\n\n \n \n\n \nAssay highlights on the Main Dyke include (Table 1):\n\n\n1.42 % Li2O and 158 ppm Ta over 19.17 m, PWM-18-84\n1.17 % Li2O and 193 ppm Ta over 27.16 m, PWM-18-84\n2.67 % Li2O over 0.42 m, PWM-18-84\n1.67 % Li2O and 157 ppm Ta over 10.20 m, PWM-18-92\n\nThe summer 2018 drill program also targeted the new spodumene dy...

More updates from Power Metals Corp.