Business

Power Nickel Defines Initial Volume on its High-Grade Cu-Pt-Pd-Au-Ag Zone 5km Northeast of its Main Nisk Deposit

Power Nickel Defines Initial Volume on its High-Grade Cu-Pt-Pd-Au-Ag Zone 5km Northeast of its Ma...

articlePower Metallic Mines Inc.March 4, 20245/company/power-metallic/news/power-nickel-defines-initial-volume-on-its-high-grade-cu-pt-pd-au-ag-zone-5km-northeast-of-its-main-nisk-deposit
Power Nickel Defines Initial Volume on its High-Grade Cu-Pt-Pd-Au-Ag Zone 5km Northeast of its Main Nisk Deposit

About this update from Power Metallic Mines Inc.

[{"type":"text","content":"\n \n \n \n Power Nickel Defines Initial Volume on its High-Grade Cu-Pt-Pd-Au-Ag Zone 5km Northeast of its Main Nisk Deposit\n \n \n /* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n \n \n \n \n \n \n Canada NewsWire\n \n \n \n \n \n Discovery Hole had over\n \n One Oz\n \n /Tonne Combined Platinum and Palladium over 7.75 Metres\n \n \n \n \n \n TORONTO\n \n \n ,\n \n \n March 4, 2024\n \n \n /CNW/ -\n \n Power Nickel Inc.\n \n (the \"Company\" or \"Power Nickel\")\n \n \n (TSXV: PNPN) (OTCBB: PNPNF) (Frankfurt: IVVI) is pleased to announce that hole PN-24-047 of the drill program aiming at following up on the Wildcat high-grade PGM intersection has intersected the anticipated mineralized zone some 40 meters to East of the discovery hole. Along with PN-24-044 (\n \n Feb 22nd, 2024\n \n ), this makes it the third intersection similar to the discovery hole announced\n \n May 10\n \n \n th\n \n , 2023. An EM anomaly was also tested some\n \n 225 m\n \n further East (PN-24-045) but did not visually intersect significant mineralization.\n \n \n \n \n \n \n \n \n \n As previously stated (\n \n Feb 22nd, 2024\n \n ), PN-24-044 successfully intersected the chalcopyrite-rich zone approximately\n \n 100 m\n \n downdip the initial Hole PN-23-031A (\n \n Figure 1\n \n ). Confirmation of the zone presence at depth was part of a strategy to systematically drill a series of EM targets that are lining up with the tonalite-ultramafics contact at surface.\n \n \n Given the triple amount of massive chalcopyrite observed in hole PN-24-044 compared to PN-23-031A, the focus of the Wildcat drilling program has now shifted to defining the extent of the mineralized zone. The remaining EM anomalies shall be tested later.\n \n \n A series of off-section drillholes were planned on a\n \n 50 m\n \n grid to start defining the volume of the high-grade PGM mineralized zone. The current hole PN-24-047, planned to test the lateral continuity of the zone to the east, encountered the anticipated zone at a downhole depth of approximately\n \n 150 m\n \n (\n \n Figure 2\n \n ).\n \n \n \n \n \n \n \n \n \n \"We are eve...

More updates from Power Metallic Mines Inc.