Business
Drilling Commences at Dalakuru - replacement
Drilling Commences at Dalakuru - replacement.

About this update from Power Metal Resources Plc
[{"type":"text","content":"\n \nRNS Number : 8878Y Sula Iron & Gold PLC 08 March 2017 \n\nCORRECTION OF RNS NUMBER: 8844Y\n \nPlease note that RNS 8844Y did not include a link to the photograph referred to below. This has been corrected and all other details remain the same.\n \n8 March 2017\nSula Iron & Gold plc\n(\"Sula\" or the \"Company\")\n \nFerensola Gold Project - Drilling Commences at Dalakuru\nSula (AIM: SULA), the gold exploration company focused on Sierra Leone, is pleased to announce that the first of the two drill rigs has now commenced drilling at the Company's Dalakuru Exploration Camp on its Ferensola project site (the \"Dalakuru Exploration Camp\"). This start-up of drilling operations is in line with Sula's plan to phase-in drilling by commencing with one rig and then, once drilling is proceeding smoothly, to commence drilling with the second. \nThe first rig is focusing on Sula's Eastern Target. As outlined previously, this 4km long ridge has a very strong Induced Polarisation (\"IP\") anomaly, which Sula believes is indicative of pyrite mineralisation. Elsewhere on the Ferensola licence, this pyrite mineralisation is associated with gold. As announced by Sula on 2 February 2017, oxide ore collected from a road cutting over the Eastern Target, near to where the first holes will be drilled, returned a grade of 4.8g/t gold. \nThe second rig will drill additional holes on Sula's Sanama Hill, where Sula has an Exploration Target, as defined by SRK Consulting of 5 to 7 million tonnes grading at between 4g/t - 8g/t for 0.8 - 1.5million ounces of gold. This rig will test for extensions of the known gold mineralisation.\nAs announced on 26 October 2016, the 50km IP survey Sula conducted over a section of its 153km2 Ferensola licence identified a total of 8.5km of strong IP anomalies. The current work programme is drilling the largest anomaly, being the Eastern Target, but a further 4.5km of untested prospective anomalies remain to be tested in the future.\nA photograph of the initial drill rig on site at the Dalakuru Exploration Camp is displayed via the link below:\nhttp://www.rns-pdf.londonstockexchange.com/rns/8878Y_-2017-3-8.pdf\n \nRoger Murphy, Sula's CEO, commented:\n\"I'm very happy that drilling has now commenced. We are very excited by the potential at our 4km Eastern Target, which ...