Business

Block 8 Oman: Drilling Programme Results

Power Metal Resources PLC has announced encouraging results from its maiden drilling programme at the Block 8 concession in Oman, completing eight drill holes for a total of 724.45 metres. The programme identified lithological units, alteration, and mineralisation consistent with copper-dominant Volcanogenic Massive Sulphide deposits, with notable downhole intercepts including 1.04% Copper over 1.5m in hole AM25DD001. This work fulfills the $740,000 expenditure required to earn a 12.5% stake in the project, and the company plans further trenching and drilling to advance understanding of the mineralised zones. Disclaimer*

articlePower Metal Resources PlcDecember 15, 20253/company/power-metal-resources-plc/news/block-8-oman-drilling-programme-results
Block 8 Oman: Drilling Programme Results

About this update from Power Metal Resources Plc

[{"type":"text","content":"\n\n15 December 2025\nPower Metal Resources PLC\n(\"Power Metal\" or the \"Company\")\nBlock 8 Oman: Drilling Programme Results\n \nPower Metal Resources PLC (AIM: POW, OTCQB: POWMF), the London listed exploration company and project incubator with a global project portfolio, and its majority held subsidiary Power Arabia Ltd (\"Power Arabia\"), are pleased to provide an update on the maiden drilling programme on the Block 8 concession in Oman (\"Block 8\" or the \"Project\").\nHighlights:\n·   Maiden reconnaissance diamond core drilling programme completed in October 2025, with eight drill holes for a total meterage of 724.45 metres (\"m\") drilled.\n·   Identified lithological units, alteration, brecciation and mineralisation consistent with copper-dominant (Cyprus-type) Volcanogenic Massive Sulphide (\"VMS\")1, 2.\n·   All holes intersected prospective lithological units, including basalt and andesite with associated carbonate, chlorite and epidote alteration.\n·   Highlight downhole depth intercepts of:\n·   1.04% Copper (\"Cu\") over 1.5m (hole AM25DD001 from 95.5-97m within wider zone returning 0.52% Cu from 95.5-99.0m);\n·   0.36% Cu over 1m (AM25DD001 from 72-73m, within a broader elevated Cu zone from 68-77m);\n·   0.35% Cu over 4m (AM25DD001 from 80-84m, with up to 0.56% Cu from 80-81m);\n·   0.19% Cu over 4m (AM25DD002 from 85-89m);\n·   Elevated Cu, lead (\"Pb\") and zinc (\"Zn\") results over 18 m (AM25DD003 from 35-53m, associated with a sulphide stockwork in a fault zone); and\n·   1.1% Zn over 1m (AM25DD006 from 51-52m, plus elevated Cu and Zn from 51-58m).\nBlock 8 is the subject of an agreement for Power Metal to earn a 12.5% stake in the Project held by ASX-listed Alara Resources Limited (\"Alara\") and Awtad Copper LLC (\"Awtad Copper\"). The exploration work, led and undertaken by the Power Arabia technical team, commenced in October 2024 following the signing of a formal and legally binding agreement on 25 October 2024.3, 4\nThe drilling programme completes the initial 12.5% earn-in.\n \nSean Wade, Chief Executive Officer of Power Metal Resources PLC, commented: \n\"The results of the maiden drilling programme are very encouraging and confirm our view that this is a prospective area that has bee...

More updates from Power Metal Resources Plc