Business

Avangrid Completes Installation of American-Made Panels at Oregon Solar Farm

BOARDMAN, Ore., March 09, 2026--Avangrid, Inc., a leading energy company and member of the Iberdrola Group, today announced that it has completed the installation of more than 250,000 American-made solar panels at its Tower Solar project in Morrow County, Oregon. The project’s solar panels were assembled domestically by SEG Solar at its new Houston manufacturing facility. Avangrid continues to work on other aspects of the project ahead of commercial operation expected later this year. The 166 MW

articlePortland General Electric CoMarch 9, 20263/company/portland-general-electric-co/news/avangrid-completes-installation-of-american-made-panels-at-oregon-solar-farm
Avangrid Completes Installation of American-Made Panels at Oregon Solar Farm

About this update from Portland General Electric Co

[{"type":"image","alt":"Avangrid’s Tower Solar project in Morrow County, Oregon. Photo Courtesy of Avangrid","displaySize":"","headline":null,"caption":"Avangrid’s Tower Solar project in Morrow County, Oregon. Photo Courtesy of Avangrid","credit":null,"className":"","disableSlideshowImg":false,"size":{"original":{"width":480,"height":360,"url":"https://media.zenfs.com/en/business-wire.com/ea7644103796e48a4a2ee7f8c9f9bc54"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/LzNBvRjZvxOXOmbO9klCgg--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTcyMDtjZj13ZWJw/https://media.zenfs.com/en/business-wire.com/ea7644103796e48a4a2ee7f8c9f9bc54","width":480,"height":360}},"lazy":false},{"type":"image","alt":"","displaySize":"","headline":null,"caption":"","credit":null,"className":"","disableSlideshowImg":false,"size":{"original":{"width":480,"height":233,"url":"https://media.zenfs.com/en/business-wire.com/5d725bdeb5ac0cc5e3a6490f058a83dc"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/ijkeEpDDaksI1XBuc3gzxA--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTQ2NjtjZj13ZWJw/https://media.zenfs.com/en/business-wire.com/5d725bdeb5ac0cc5e3a6490f058a83dc","width":480,"height":233}}},{"type":"text","content":"166-Megawatt DC (120 MWac) Tower Solar project, consisting of more than 250,000 SEG Solar panels, expected to reach commercial operation later this year","length":152,"tagName":"p","attribs":{}},{"type":"text","content":"Project will deliver energy to Portland General Electric’s grid, support QTS operations in the region","length":101,"tagName":"p","attribs":{}},{"type":"text","content":"BOARDMAN, Ore., March 09, 2026--(BUSINESS WIRE)--Avangrid, Inc., a leading energy company and member of the Iberdrola Group, today announced that it has completed the installation of more than 250,000 American-made solar panels at its Tower Solar project in Morrow County, Oregon. The project’s solar panels were assembled domestically by SEG Solar at its new Houston manufacturing facility. Avangrid continues to work on other aspects of the project ahead of commercial operation expected later this year. The 166 MWdc (120 MWac) project will deliver energy to the Portland General Electric (PGE) power grid and help support a new QTS data center campus in the region.","length":669,"tagName":"p"},{"type":"text","content":""This is a major milestone for Tower Solar and demonstrates how investment ...

More updates from Portland General Electric Co

Avangrid, Inc.Morrow County, OregonAvangridSolar project