Business
Midas Gold Files Technical Report for Stibnite Gold Project Feasibility Study on SEDAR
Midas Gold Files Technical Report for Stibnite Gold Project Feasibility Study on SEDAR ...

About this update from Perpetua Resources Corp.
[{"type":"text","content":"\n \n \n \n Midas Gold Files Technical Report for Stibnite Gold Project Feasibility Study on SEDAR\n \n \n /* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n \n \n \n \n \n \n Canada NewsWire\n \n \n \n \n \n BOISE, Idaho\n \n ,\n \n Jan. 28, 2021\n \n /CNW/ -\n \n Midas Gold Corp.\n \n (TSX: MAX) (OTCQX: MDRPF) today announced that it has filed an independent technical report on SEDAR in accordance with National Instrument 43-101 (\"NI 43-101\") that details the results of the recent feasibility study on the company's Stibnite Gold Project in\n \n Idaho\n \n (the \"Technical Report\").\n \n \n Minor changes were made to the economic model in the process of finalizing the Technical Report that resulted in slightly lower initial capital costs and similar overall economic indicators relative to the estimates included in the\n \n December 22, 2020\n \n news release. The fundamental results of the economic analyses remain unchanged.\n \n \n To view and download the Technical Report titled \"Stibnite Gold Project Feasibility Study Technical Report\" dated\n \n January 27, 2021\n \n , please visit\n \n www.sedar.com\n \n . The Technical Report will also be available on the Company's website at\n \n www.midasgoldcorp.com\n \n .\n \n \n \n Qualified Persons\n \n \n \n The Technical Report was compiled by M3 Engineering & Technology Corp. (\"M3\") under the direction of independent qualified persons (as defined under NI 43-101) (\"QPs\" or \"Qualified Persons\") and in accordance with the requirements of NI 43-101. The QPs responsible for the Technical Report include:\n \n Richard Zimmerman\n \n , SME-RM (onsite and offsite infrastructure, cost estimating and financial modeling) and Art Ibrado, P.E. (mineral processing) with M3;\n \n Garth Kirkham\n \n , P.Geo. (mineral resources) with Kirkham Geosystems Ltd.;\n \n Christopher Martin\n \n , C.Eng. (metallurgy) with Blue Coast Metallurgy Ltd.;\n \n Grenvil Dunn\n \n , C.Eng. (hydrometallurgy) with Hydromet WA (Pty) Ltd.; Chris Roos, P.E. (mineral reserves) and\n \n Scott Rosenthal P.E\n \n . (mine planning) with Value Consulting, Inc...