Business
Pelangio Exploration Begins Drill Program at Manfo Project
Pelangio Exploration Begins Drill Program at Manfo Project Toronto, Ontari...

About this update from Pelangio Exploration Inc.
[{"type":"text","content":"Pelangio Exploration Begins Drill Program at Manfo Project \n\t\t\tbody { font-size: 11pt;\n\t\t\t}\n\n\t\t\t.nr-sub-head ul,\n\t\t\t.nr-body ul {\n\t\t\t\tlist-style-type: disc !important;\n\t\t\t\tmargin-left: 2em !important;\n\t\t\t}\n\n\t\t\t.nr-sub-head ol,\n\t\t\t.nr-body ol {\n\t\t\t\tmargin-left: 2em !important;\n\t\t\t}\n\n\t\t\t.nr-body p, .nr-body {margin-bottom: 0px !important;\n\t\t\t\t\tmargin-top: 0px !important;\n\t\t\t\t\t-webkit-margin-before: 0px !important;\n\t\t\t\t\t-webkit-margin-after: 0px !important;\n\t\t\t\t\tfont-family: Arial !important;\n\t\t\t\t\tfont-size: 11pt !important;\n\t\t\t }\n\n\t\t\ttbody {\n\t\t\t\tborder-top: 0;\n\t\t\t}\n\n\t\t\t H1 {font-weight: bold;\n\t\t\t\tfont-size: 16pt;\n\t\t\t }\n\n\t\t\t H2 {font-weight: bold;\n\t\t\t\tfont-size: 12pt;\n\t\t\t }\n\n\t\t\t H3 {font-weight: bold;\n\t\t\t\tfont-size: 11pt;\n\t\t\t }\n\n\n\t\t\t H1.nr-head {\n\t\t\t \t\tfont-family: Trebuchet MS !important;\n\t\t\t \t\tfont-size: 16pt !important;\n\t\t\t \t\tcolor: #3D86C6 !important;\n\t\t\t \t\tfont-weight:bold !important;\n\t\t\t \t\ttext-align:center !important;\n\n\t\t\t }\n\n\t\t\t H2.nr-sub-head {font-weight: bold !important;\n\t\t\t \t\tdisplay: block !important;\n\t\t\t \t\ttext-align: start !important;\n\t\t\t \t\tfont-family: Arial !important;\n\t\t\t\t\tfont-size: 12pt !important;\n\t\t\t }\n\n\t\t\t .nr-body a { font-size: 11pt !important;\n\t\t\t }\n\n\t\t\t TABLE { width: auto!important;\n\t\t\t }\n\n\t\t Pelangio Exploration Begins Drill Program at Manfo Project\n Toronto, Ontario (FSCwire) - Pelangio Exploration Inc. (PX:TSX-V; OTC PINK:PGXPF) (“Pelangio” or the “Company”) announces the commencement of the first phase of a $2,000,000 multi‐phase exploration program targeting the existing mineralized structures and the newly identified belt bounding structures at its Manfo Project, in Ghana, West Africa. This first phase will consist of Air Core (AC) and Reverse Circulation (RC) drilling which will be completed using the cost-effective grasshopper drill. Pelangio has mobilized the drill to the Manfo Property, and drilling is underway.\n\n \n\nThe Main Focus:\n\n \n\n\n\tPokukrom East (host of the maiden Resource Estimate) - follow up on two drill sections, one of which intersected 35m at 1.13 g/t Au\n\n\n \n\n\n\tNkansu – fo...