Business
Patriot Extends Strike of the CV5 Pegmatite, Drills 34.2 m at 1.06% Li2O in Step-Out Hole and 11.6 m at 3.25% Li2O in Infill Hole, Quebec, Canada
Patriot Extends Strike of the CV5 Pegmatite, Drills 34.2 m at 1.06% Li2O in Step-Out Hole and 11....

About this update from Pmet Resources Inc.
[{"type":"text","content":"\n \n \n \n Patriot Extends Strike of the CV5 Pegmatite, Drills 34.2 m at 1.06% Li2O in Step-Out Hole and 11.6 m at 3.25% Li2O in Infill Hole, Quebec, Canada\n \n \n /* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prngen4{\nPADDING-RIGHT:0.17em; PADDING-LEFT:0.17em; VERTICAL-ALIGN: TOP; TEXT-ALIGN: CENTER; BORDER-TOP:black 0.5pt solid; BORDER-RIGHT:black 0.5pt solid; BORDER-BOTTOM:black 0.5pt solid; BORDER-LEFT:black 0.5pt solid\n}\n.prngen5{\nPADDING-RIGHT:0.17em; PADDING-LEFT:0.17em; VERTICAL-ALIGN: TOP; BORDER-TOP:black 0.5pt solid; BORDER-RIGHT:black 0.5pt solid; BORDER-BOTTOM:black 0.5pt solid; BORDER-LEFT:black 0.5pt solid\n}\n.prngen3{\nPADDING-RIGHT:0.17em; PADDING-LEFT:0.17em; FONT-SIZE: 8PT; FONT-FAMILY: ARIAL; COLOR: BLACK; MARGIN:0em; BORDER-TOP:black 1pt; BORDER-RIGHT:black 1pt; BORDER-BOTTOM:black 1pt; BORDER-LEFT:black 1pt\n}\n.prnml4{\nMARGIN-TOP:0em; MARGIN-RIGHT:0em; MARGIN-BOTTOM:0em; MARGIN-LEFT:0.33em !IMPORTANT\n}\n.prnbcc{\nBORDER-COLLAPSE: COLLAPSE\n}\n.prnbcs{\nBORDER-COLLAPSE: SEPARATE\n}\n \n \n \n \n \n \n Canada NewsWire\n \n \n \n \n \n \n VANCOUVER, BC\n \n \n ,\n \n \n Feb. 6, 2024\n \n \n /CNW/ -\n \n \n \n February 7, 2024\n \n –\n \n Sydney, Australia\n \n \n \n \n \n \n Highlights\n \n \n \n \n The\n \n CV5 Spodumene Pegmatite has now been traced over a 4.4 km strike length\n \n and\n \n remains open\n \n along strike at both ends and to depth\n \n – results of 2023 drill holes for an additional\n \n \n 0.2 km of prospective strike length remain to be reported.\n \n \n \n In addition to infill, further step-out drilling is planned at the CV5 Spodumene Pegmatite as part of the 2024 winter program currently underway at the Property. Approximately 3 km of highly prospective geological trend remains to be drill tested between the CV5 and CV13 pegmatites.\n \n \n Strong grades continue to be returned over the western extension and outside of the\n \n June 2023\n \n mineral resource estimate at CV5:\n \n \n \n \n 34.2 m\n \n at 1.06% Li\n \n 2\n \n O\n \n , including\n \n \n 14.2 m\n \n at 1.83% Li\n \n 2\n \n O\n \n (CV23-236).\n \n \n \n \...